Building regulations are minimum legal standards for design and construction that ensure your home is safe, energy efficient and structurally sound. Whenever you alter your property or build an extension, you must check if your project needs building regulations approval before you begin. This system is separate from planning permission, and missing certificates can cause problems when you come to sell your home.
What building regulations are for
Building regulations exist to protect people in and around buildings. They set out the minimum standards for how a building must be constructed, covering structure, fire safety, insulation, ventilation, drainage and electrical safety. The rules ensure that floors will not collapse under heavy weights, fires cannot spread rapidly through hidden cavities, and homes retain heat without suffering from damp or condensation.
Each nation of the UK has its own building regulations. This guide describes the system used in England. Wales follows a broadly similar process with its own rules, Scotland uses a separate system in which work such as extensions and loft conversions needs a building warrant before it starts, and Northern Ireland has its own regulations enforced by council building control. If you live outside England, check the details with your local authority.
The regulations are broken down into different parts, usually referred to by letters. You do not need to read or understand the technical documents yourself. Your builder, your architect and the building control officer will use them to ensure the work is done safely.
How they differ from planning permission
Homeowners regularly confuse planning permission with building regulations. They are two separate systems governed by different laws, and many projects need one, both or neither. You must check the requirements for both systems before you start any work on your home.
Planning permission is about how a building looks, its overall size, where it is positioned and how it affects the local environment and your neighbours. Many standard extensions and loft conversions on houses fall under permitted development rights, which means they do not need a formal planning application as long as they stay within set limits on size and height. Flats and maisonettes do not have these permitted development rights, and listed buildings and homes in conservation areas face tighter restrictions.
Building regulations are concerned purely with how the physical structure is built and whether it is safe to use. Even if your project is permitted development and does not need planning permission, it will almost certainly still need building regulations approval. If you are unsure what applies to your property, you can read our detailed guide on whether you need planning permission.
Which home projects need approval
The rules apply to the construction and extension of buildings and to many common internal alterations. According to the official government guidance, you will need approval for a wide range of structural and service work. Other work not explicitly listed may also need approval, so you should always check.
Your project will require building control involvement if you are doing any of the following:
- Building an extension or a completely new dwelling
- Converting a loft or attic into a liveable space
- Replacing fuse boxes and connected electrics
- Installing a bathroom that involves new plumbing
- Changing electrics near a bath or shower
- Installing fixed air conditioning
- Replacing windows and doors
- Installing or replacing a heating system
Roof repairs or re-covering also need approval if they affect more than 25 per cent of the building envelope or more than 50 per cent of the roof area. If you are doing smaller, minor repairs below those limits, you do not normally need to make a building control application.
Loft conversions always need approval. Even if you are only boarding over existing loft joists to create storage space, you may still need approval because standard ceiling joists are not designed to take significant extra weight. You can read more about what a loft conversion costs to understand the full scope of the required structural work.
Work that is usually exempt
Some small projects do not require you to apply for building regulations approval. The most common exemption for homeowners is a basic ground level conservatory, provided it meets several strict conditions.
A conservatory is exempt from building regulations if it meets all of these criteria:
- It is built entirely at ground level
- The internal floor area is under 30 square metres
- It is separated from the house by external quality walls, doors or windows
- It has an independent heating system with separate temperature controls
- Any glazing and fixed electrical installations comply with the applicable safety rules
If you remove the external doors or the wall between your house and the conservatory to create an open plan space, the conservatory is no longer separated from the house and does not meet the conditions above. Any new structural opening between the house and the conservatory also needs building regulations approval, even when the conservatory itself is exempt.
Who applies and who is responsible
As the homeowner, you are ultimately responsible for ensuring that all building work complies with the regulations. If the work does not comply, the person doing the work could be prosecuted and fined. As the owner, you could be made to pay to fix faulty work, and you would be left without the certificates you may need when you sell.
In practice, your main contractor or architect will usually submit the application and deal with the inspectors on your behalf. You should agree this clearly in writing before you sign a contract. Never assume the builder has sorted the paperwork unless you have seen the official application reference number yourself.
For certain specific trades, you do not need to get approval yourself if you use someone registered with a competent person scheme. These government-approved schemes allow qualified tradespeople to self-certify that their work meets the required standards. They will then notify the local authority on your behalf and issue you with a compliance certificate directly.
Council building control or a private approver
When you need approval for a project, you have a choice of who inspects the work. You can apply through your local council building control department or you can hire a private registered building control approver. Both routes are valid. A council issues a completion certificate at the end of the job and a registered approver issues a final certificate, which serves the same purpose.
Council building control teams are run by your local authority. Their fees are calculated based on the cost of providing the service for your specific type of project. You typically pay one fee when you submit the plans and a second fee when they make their first site inspection.
A registered building control approver is a private firm registered with the Building Safety Regulator to carry out the same checks. They agree their fees directly with you upfront. Some builders have an approver they work with regularly, but the choice is yours.
Full plans, building notice and competent person schemes
There are three main ways to get your work approved. The right route depends on the size of your project and the specific trades involved.
A full plans application is the most thorough route and is highly recommended for extensions, loft conversions and major renovations. You or your architect submit detailed drawings, a written specification and a structural engineer's calculations before any work begins. The inspector reviews everything and approves the design. This gives you and your general builder total certainty that the planned work is legal before you spend any money on materials.
A building notice is a faster route meant only for smaller, simple projects. You do not need to submit detailed drawings upfront. The builder simply relies on their knowledge of the rules as they work, and the inspector checks the progress on site. This route carries more risk, because there is no approved design to fall back on, and if the inspector finds that something does not comply it may have to be altered or redone.
The competent person scheme route covers specific installations like gas boilers, electrical rewiring and replacement windows. The tradesperson does the work and issues a compliance certificate upon completion. Gas work must be done by a Gas Safe registered engineer and electrical work by a registered electrician.
This table shows the typical statutory timelines for the different application routes.
|
Application type |
Time before you can start work |
Decision or certificate timeline |
|---|---|---|
|
Full plans application |
Best after the plans are approved |
Decision within 5 weeks (or 2 months with your consent) |
|
Building notice |
2 days after submitting |
No formal decision notice issued upfront |
|
Completion certificate |
Not applicable |
Issued within 8 weeks of completion if work complies |
These are the timescales published on GOV.UK, and a straightforward application may be dealt with sooner. For full details on the application process, you can read the government guide on how to apply.
Inspections and the completion certificate
Whichever application route you choose, the building control inspector will visit your property at key stages of the build. They need to see the structural work before it is covered up by plasterboard, floorboards or soil.
Typical inspection stages include the foundation excavations before concrete is poured, the installation of damp proof courses, the drains before they are covered over, and the floor joists, roof timbers and insulation before they are hidden. Your main contractor must notify building control when the site is ready for each inspection.
When the project is finished, the inspector will make a final visit to check the finished work, including items such as fire safety, ventilation, stairs and glazing. If everything meets the required standard, they will issue a completion certificate.
You must keep this completion certificate safe. Without approval you will not have the certificates of compliance you will need when you sell your home. Buyers' solicitors normally ask for this document, and missing paperwork can delay a sale.
What happens if work was done without approval
If you or a previous owner carried out building work without the required approval, the responsibility now sits with you as the current owner. The local authority has the power to take enforcement action to have dangerous or non-compliant work put right.
Since 1 October 2023 the period in which a local authority can take enforcement action under section 36 of the Building Act 1984 has been extended from 12 months to 10 years after the work is completed. This means a council can require the owner to alter or remove work that does not comply for up to ten years after it was finished.
If the work was carried out after 11 November 1985, you can apply for retrospective approval, known as regularisation. This can only be done through a local authority, not a private approver. The council may ask you to open up parts of the work, such as walls or floors, so the hidden structure can be checked, and you might need to make alterations before it can be approved. If it complies, they will issue a regularisation certificate.
What to ask your builder
A good builder will want to see your approved plans before they give you a written quote. Discussing building control early is a great way to separate professional firms from cowboy builders. If you want to know more about vetting tradespeople, read our guide on how to find a good local builder.
Ask your builder these exact questions before you agree to a contract:
- Are you pricing from a full plans application or just a building notice?
- Who will notify building control when the site is ready for each inspection?
- Do you prefer working with the local council or a private approver?
- Are your plumbers and electricians registered with a competent person scheme?
- Will you supply all the final compliance certificates before I pay the final stage payment?
Never pay your final instalment until you have the final completion certificate in your hands. Once a builder has been paid in full, it is incredibly difficult to get them back to fix minor issues that the inspector demands.
Common questions
Do I need a building regulations compliance certificate to sell my house?
In practice, yes. The buyer's solicitor will normally ask for the completion certificate for any major alterations or extensions carried out on the property. If you cannot produce it, the buyer may ask you to pay for a regularisation application or an indemnity insurance policy to cover the financial risk. Missing certificates can delay a sale.
What is a retrospective building regulations compliance certificate?
This is called a regularisation certificate. It is used when work was done previously without building control consent. You apply to the local council, who will inspect the finished work, which often involves causing damage to expose the hidden structure. If the work meets the standards that were in place when it was built, they will issue the certificate.
Does a garage conversion need building regulations?
Yes, converting a garage, or part of one, into a liveable space will normally require building regulations approval. The inspector will need to check that the new room has adequate ventilation, insulation, fire safety and structural support, particularly if you are replacing the main garage door with a new window and brick wall.
Can a private building regulations inspector sign off council work?
No. A private registered building control approver cannot sign off work that the council is overseeing, and only a local authority can issue a retrospective regularisation certificate. Choose your building control body before the work begins.
Your next steps
Getting your paperwork right early will save you a massive amount of stress once the builders arrive. Follow these practical steps to get your project moving in the right direction.
- Check the official rules to confirm exactly which parts of your project need approval
- Hire an architect or structural engineer to produce drawings and a specification
- Submit a full plans application to your council or a private approver
- Wait for the official approval decision before you ask builders to quote
- Confirm in writing that the builder will handle the site inspection notices
- Hold back your final payment until you have the official completion certificate
When you have your approved drawings and are ready to get accurate written quotes, you can find a builder near you to discuss your project and arrange site visits.
Find a top rated builder near you
3,554 builders across the UK, each ranked on their Google rating and the number of reviews behind it. Start with your county: