Answer a few questions about the house and the extension to see whether it is likely to be permitted development, likely to need prior approval or likely to need a planning application, and which Class A limit is the problem. Based on the GOV.UK technical guidance, checked 9 November 2026. England only, and a guide rather than a decision.
Result
This is a guide to the Class A limits for England, not a decision. Only the council can confirm that an extension is lawful, through a Lawful Development Certificate, and building regulations and the Party Wall Act apply whatever the planning position.
How the permitted development checker works
Most houses in England come with a set of planning rights called permitted development. For extensions, those rights are set out in Class A of Schedule 2, Part 1 of the Town and Country Planning (General Permitted Development) (England) Order 2015, as amended. The checker takes the answers you give and tests them against each Class A limit, using the figures in the GOV.UK technical guidance for householders. If every limit is met it says the extension is likely permitted development. If a single storey rear extension is deeper than the standard limit but within the larger home extension limit, it points you to the prior approval route. If any limit fails, it says a planning application is likely and names the limit.
A worked example: a semi-detached house outside a conservation area, with a single storey rear extension 3m deep, 3.5m high and with eaves of 2.8m close to the boundary. The depth is within the 3m limit for a semi, the height is under 4m, the eaves are under the 3m limit that applies within 2m of a boundary, and the materials match the house. Every test passes, so the result is likely permitted development. Change the depth to 3.5m and the standard limit fails, but the extension is within the 6m larger home extension limit, so the result becomes prior approval. Make it two storeys and only 6m from the rear boundary and the 7m rule fails, so a planning application is likely.
The limits the checker tests
Rear extensions
A single storey rear extension can project up to 4m beyond the original rear wall of a detached house, or 3m for any other house, and can be no higher than 4m. Under the larger home extension route those depths rise to 8m and 6m, but only with prior approval and only outside article 2(3) land. An extension of more than one storey can project no more than 3m and must be at least 7m from the boundary opposite the rear wall.
Side extensions
A side extension must be single storey, no higher than 4m and no wider than half the width of the original house. On article 2(3) land, side extensions are not permitted development at all. A wraparound extension, which fills the corner between a side wall and the rear wall, has to meet both the rear and the side limits.
Height, eaves and boundaries
No extension may be higher than the highest part of the existing roof, and its eaves may be no higher than the existing eaves. Where any part of the extension comes within 2m of a boundary, its eaves can be no higher than 3m. That last rule is the one that catches many single storey extensions with a pitched roof built up to the fence line.
Position, materials and features
Nothing can extend forward of the principal elevation, or of a side elevation that faces a highway. The exterior materials must be of a similar appearance to the existing house, in colour and style though not identical; conservatories are exempt. Verandas, balconies and raised platforms are excluded from Class A. Where the extension has more than one storey, upper floor side windows must be obscure glazed and fixed unless the opening part is more than 1.7m above the floor, and the roof pitch should match the house.
The 50% rule and earlier extensions
Extensions and outbuildings together can cover no more than half the land around the original house. Because every limit is measured against the original house, earlier extensions count towards the depth, width and 50% figures. A house that was already extended before you bought it may have used up its rights.
Houses with no, or reduced, rights
Flats and maisonettes have no permitted development rights for extensions, so the checker stops there. Houses created by a change of use under permitted development, for example from an office, shop or agricultural building, have no Class A rights either. Listed buildings need listed building consent. Councils can also remove rights with an Article 4 direction, common in conservation areas, or with a condition on an earlier planning permission. If you are not sure whether any of these apply, the council's planning department can tell you from the address.
Common mistakes and tips
- Measuring from the wrong wall. Depth is measured from the rear wall of the original house, so an existing extension counts.
- Forgetting the eaves rule. Within 2m of a boundary the eaves limit is 3m, however low the ridge is.
- Assuming prior approval is a formality. Neighbours are consulted and the council can refuse. Work cannot start until the council responds or 42 days pass.
- Skipping the Lawful Development Certificate. Without one you have no proof that the extension was lawful, which buyers' solicitors ask for.
- Treating planning and building regulations as the same thing. Permitted development says nothing about building regulations, structural design or the Party Wall Act.
When to get a professional
A good builder, architect or planning consultant will check these limits on a measured survey of the house rather than estimates, and will apply for the Lawful Development Certificate or prior approval before work starts. Anything near a limit, on designated land, or on a house that has already been extended is worth professional advice. The builder will also handle the building regulations application and party wall notices.
Planning an extension? Compare well reviewed local builders who can take it from the first measurements to sign-off.
Find a top rated builder near youHow this is worked out
- Flats and maisonettes: no Class A rights, so the checker stops.
- Single storey rear depth compared with 4m (detached) or 3m (other), then with 8m or 6m for the prior approval route outside article 2(3) land.
- More than one storey: depth compared with 3m and distance to the rear boundary with 7m; not permitted on article 2(3) land.
- Height of a single storey or side extension compared with 4m; eaves compared with 3m where within 2m of a boundary.
- Side width compared with half the width of the original house; side extensions not permitted on article 2(3) land.
- Yes/no tests: forward of the principal elevation, higher than the roof or eaves, verandas and balconies, materials, the 50% rule, Article 4, listed status, planning conditions and change-of-use houses.
- GOV.UK (Ministry of Housing, Communities and Local Government), Permitted development rights for householders: technical guidance (published 13 April 2016, updated 10 September 2019, checked 9 November 2026). Class A, paragraphs A.1(a) to (k): no rights for houses created by change of use under Classes M, N, P, PA or Q; 50% curtilage limit; no higher than the existing roof or eaves; not forward of the principal elevation; single storey rear extensions up to 4m (detached) or 3m (other houses) and 4m high, or 8m and 6m under the larger home extension prior approval route outside article 2(3) land; more than one storey no more than 3m beyond the rear wall and not within 7m of the rear boundary; eaves within 2m of a boundary no higher than 3m; side extensions single storey, up to 4m high and no wider than half the original house; no verandas, balconies or raised platforms. A.2 (article 2(3) land): no cladding, no side extensions, no rear extensions of more than one storey. A.3: similar materials, obscure glazed upper side windows unless the opening part is over 1.7m above the floor, matching roof pitch. The guidance says a Lawful Development Certificate can be applied for to confirm that work is lawful.
- Planning Portal, Extensions: planning permission (common projects) (checked 9 November 2026). The rules apply to houses only and not to flats and maisonettes, converted houses or land with an Article 4 direction or planning condition; limits apply to the extension combined with any previous extensions; article 2(3) land is conservation areas, Areas of Outstanding Natural Beauty, National Parks, the Broads and World Heritage Sites; the original house is the house as first built or as it stood on 1 July 1948.
- Planning Portal, Lawful Development Certificates (checked 9 November 2026). A Lawful Development Certificate is applied for from the local council to confirm that a proposal does not need planning permission; a fee is payable; the council has eight weeks to decide.
Related guides
Permitted development questions
How far can I extend without planning permission?
Under Class A of the General Permitted Development Order, a single storey rear extension can go up to 4 metres beyond the original rear wall of a detached house, or 3 metres for a semi-detached or terraced house, and be no higher than 4 metres. Outside conservation areas and other article 2(3) land, the larger home extension route allows up to 8 metres or 6 metres with prior approval from the council. Every other limit still has to be met.
Can I build a two storey extension under permitted development?
Sometimes. The GOV.UK technical guidance allows an extension of more than one storey to extend up to 3 metres beyond the original rear wall, provided it is at least 7 metres from the boundary opposite the rear wall, no higher than the existing roof, and its roof pitch matches the house. Two storey rear extensions are not permitted development on article 2(3) land, and two storey side extensions are never permitted development.
Do flats have permitted development rights for extensions?
No. The Planning Portal states that the Class A rules apply to houses only and lists flats and maisonettes among the properties they do not apply to. An extension to a flat or maisonette needs a planning application, and usually the freeholder's consent as well.
What is the larger home extension scheme?
It is the prior approval route in paragraph A.1(g) of Class A. A single storey rear extension deeper than the standard 4 or 3 metre limit, but no deeper than 8 metres (detached) or 6 metres (other houses), can go ahead if the homeowner notifies the council first. The council tells the neighbours, who can object, and work cannot start until the council confirms that prior approval is not needed or grants it. The route is not available on article 2(3) land.
What is a Lawful Development Certificate and do I need one?
A Lawful Development Certificate is a formal decision from the council that a proposal does not need planning permission. The Planning Portal says it is not required by law, but it is the only way to prove that an extension was lawful, which matters when the house is sold. It costs a fee and the council has eight weeks to decide. This checker cannot replace one.
Does permitted development mean I can skip building regulations?
No. Permitted development only concerns planning permission. The GOV.UK technical guidance notes that building regulations and the Party Wall Act still apply, so an extension needs a building regulations application and, where it affects a shared wall or is close to a neighbour's foundations, party wall notices.
Ready to build? Compare well reviewed builders near you who handle planning, building regulations and the work itself.