Cost Guides

How Much Does a Loft Conversion Cost in the UK?

Typical UK loft conversion prices by type, the extra fees people forget, how long the work takes, and how to keep your quote realistic.

Illustration of a cutaway of a two-storey house

A typical loft conversion in the UK costs from about £25,000 for a basic rooflight conversion to £120,000 or more for a mansard in London. The final price you pay depends heavily on the shape of your existing roof, where you live and the level of finish you choose. Before you speak to a builder, you need to understand how these projects are priced and what permissions you must arrange before work begins.

Typical loft conversion costs at a glance

The table below shows the broad cost of converting a loft based on the style of the new roof.

Type of conversion

Outside London

London

Rooflight

£25,000 to £40,000

£40,000 to £55,000

Rear dormer

£45,000 to £80,000

£60,000 to £90,000

Hip to gable

£55,000 to £75,000

£75,000 to £100,000

L-shape dormer

£60,000 to £80,000

£75,000 to £105,000

Mansard

£60,000 to £90,000

£85,000 to £120,000+

These figures are typical published prices for 2026 and your local quotes will differ with your roof structure, design, access and finish. Builders price from detailed drawings and a specification, not from a simple cost per square metre. A specification is a written document detailing exactly what materials will be used and what work is included. Per square metre figures are only a way to set an early budget, and published figures differ widely because some cover a basic shell and others a finished room.

Outside London, a rough guide is £1,800 to £3,800 per square metre depending on the type of conversion. You should also remember that a build quote usually excludes kitchens and bathrooms, flooring and decoration, professional fees, planning and building control fees, party wall costs and VAT at 20 per cent.

Cost by type of conversion

A rooflight conversion is the most affordable route because it uses the existing shape of your roof. The builder installs windows directly into the slope, adds a staircase and reinforces the floor. Because there are no major changes to the external walls or roofline, you save significantly on materials and labour.

A rear dormer builds a box shape outwards from your sloping roof. This creates vertical walls and a flat ceiling, giving you much more usable floor space and headroom. It is a very common choice for terraced and semi-detached houses, offering a good balance between the extra space gained and the money spent.

A hip to gable conversion is used on houses with a sloping side roof, known as a hipped roof. The builder extends the side wall straight up to form a vertical gable, and builds the roof across to meet it. This provides enough internal height to make the new room usable, usually accommodating a new staircase comfortably.

An L-shape dormer extends over both the main roof of the house and a smaller rear extension. This style is particularly common on older Victorian and Edwardian properties. It creates a vast amount of space, often enough for two bedrooms and a bathroom, which is why the cost is higher than a standard rear dormer.

A mansard conversion normally replaces one entire side of your roof. It features a very steep outer wall and a nearly flat roof on top. Building a mansard is essentially constructing a whole new storey on your house, requiring significant structural work and often brickwork to build up the party walls. This makes it the most expensive option.

Why London and the South East cost more

Labour is a large share of any building job. A general builder, also known as a main contractor, oversees the project and brings in specialist subcontractors like plasterers, plumbers and electricians. The daily rates for all these trades are substantially higher in London and the South East than in the rest of the UK.

Logistics also push up the price in the capital. Narrow terraced streets make it difficult to deliver heavy materials, and parking permits for tradespeople add a steady daily expense. When a builder has to carry materials through the house rather than using a crane or scaffolding outside, the job takes longer and costs more.

Properties in London are often densely packed, making party wall agreements with neighbours more complex and likely to require expensive surveyors. The combination of high wages, slow access and strict local rules means you must budget significantly more if you live in or around the capital.

The fees on top of the build price

Before a builder can give you a fixed price, you must pay professionals to design the space and prove it is safe. These fees are usually separate from a builder's quote and most fall due early in the process.

  • Architectural drawings cost between £2,000 and £5,000 to turn your ideas into a buildable design.
  • A structural engineer charges £600 to £1,500 for the calculations needed to specify the steelwork and timber safely.
  • A householder planning application fee in England is £548 from 1 April 2026.
  • A lawful development certificate gives written proof that a project is permitted development and costs half the normal planning fee.
  • Building control fees are charged by your council or a registered building control approver to inspect the work as it progresses.
  • A party wall surveyor costs £1,000 to £2,500 per neighbour if you cannot agree to the work directly with them.

You must also hold back money for a contingency fund. A contingency is a pot of cash set aside for unexpected problems, such as discovering rotten timbers when the roof is opened up. Without a contingency, a single surprise can halt your entire project.

What pushes a loft conversion quote up

Adding a bathroom is one of the fastest ways to increase your costs. It requires the main contractor to bring in plumbing subcontractors for the first fix and second fix stages. First fix involves running the hidden pipes and drainage before the walls are plastered, while second fix covers installing the toilet, shower and taps.

The structural demands of your specific roof will also dictate the price. Most lofts need heavy steel beams to support the new floor and take the weight of the altered roof. Steelwork is expensive to manufacture and heavy to lift into place, often requiring a crane.

Your choice of staircase has a major impact on the budget. A standard straight flight of stairs made from softwood is relatively cheap, but a custom staircase designed to match your existing hallway with hardwood details and glass balustrades will cost considerably more.

Quotes often include provisional sums. These are allowances for things that cannot be priced yet, such as the exact tiles you want. If you eventually choose luxury finishes, the final bill will exceed the provisional sum. High-end bespoke finishes, custom-built wardrobes and premium roof windows will always push the final figure up.

Is your loft suitable?

Not every loft can be converted easily. As a rule of thumb, you need a ridge height of at least 2.2 to 2.3 m from the top of the existing ceiling joists to the underside of the ridge board at the peak of the roof. If your loft is lower than this, the builder will have to lower the ceilings in the rooms below or raise the entire roof, both of which add immense cost.

You should confirm this measurement with a designer before you spend money on full architectural plans. You must also consider the age of your property. Houses built or refurbished before 2000 may contain asbestos. If asbestos is found, it must be dealt with by competent people, which will add a specialist removal fee to your budget.

Planning permission and building regulations

Planning permission and building regulations are two separate systems and many projects need one, both or neither. Planning deals with how the building looks and its impact on neighbours, while building regulations ensure the structure is safe and energy efficient. Scotland and Northern Ireland have their own systems, so you should check locally if you live there.

Many extensions and loft conversions on houses fall under permitted development, meaning you do not need full planning permission if you stay within set limits on size, height and position. You can use a lawful development certificate to prove your design meets these rules. However, permitted development rights do not apply to flats or maisonettes, and conservation areas, listed buildings and properties with planning conditions are more restricted.

To qualify as permitted development, your project must meet strict criteria. The Planning Portal sets out the planning rules for a loft conversion in England, and the main limits are listed below. The rules are different in Wales, Scotland and Northern Ireland.

  • The added volume is no more than 40 cubic metres for terraced houses or 50 cubic metres for all other houses, including previous enlargements.
  • The materials used on the exterior are similar in appearance to the existing house.
  • The enlargement is set back at least 20cm from the original eaves where practicable.
  • The enlargement is no higher than the highest part of the existing roof and does not extend beyond the roof slope on the side of the house that faces the road.
  • The design includes no verandas, balconies or raised platforms.
  • Any side-facing windows are obscure-glazed, and any part that opens is at least 1.7 m above the floor.
  • The property is not located on designated land such as a conservation area.

If your project falls outside these limits, you must apply for full planning permission. If you are unsure about your rights, it is wise to read our guide on whether you need planning permission before you start.

Regardless of planning, building regulations approval is required to convert a loft into a liveable space. This ensures the new floor is strong enough, the structure and existing roof stay stable, there is safe escape from fire, the stairs are safely designed and there is reasonable sound insulation.

Approval comes from council building control or a registered building control approver, or through a competent person scheme for certain trades. The completion certificate matters when selling your home. Councils can now take enforcement action for up to ten years if you build without approval, so it is vital to understand building regulations for home improvements.

How long a loft conversion takes

A typical project is 8 to 12 weeks on site. This period covers the heavy structural work, making the building weathertight against the rain, and completing the plastering and second fix trades. Making the building weathertight is a crucial early milestone that protects the rest of your home from water damage.

Before any tools are lifted, you face 3 to 6 months of design and approvals. Drafting plans, consulting a structural engineer and waiting for the council takes time. Most planning applications are decided within 8 weeks. Once permission is granted, work must start within three years in England, or five years in Wales.

During the build, you are bound by the CDM Regulations 2015. However, as a domestic client, your health and safety duties normally pass to the builder. The Party Wall etc. Act 1996 also applies in England and Wales to work on or near a shared wall or boundary, so you may need to serve notice on your neighbours well before the start date.

How to get quotes you can compare

You should always get three written quotes against the exact same drawings and schedule of works. A schedule of works is a clear list of every task the builder must perform. If you ask three builders to quote from a verbal description, they will all assume different materials and you will not be able to compare their prices fairly.

Under the Consumer Rights Act 2015, any work must be done with reasonable care and skill, for a reasonable price and within a reasonable time where none was agreed. A quote is a fixed price, whereas an estimate is not. You should never accept an estimate for a major building project.

A proper written contract protects your money. It should include stage payments tied to physical progress on site, never to calendar dates. You should hold back a final payment on completion. This money is paid only after snagging is finished. Snagging is the process of inspecting the finished rooms and having the builder fix minor defects like cracked plaster or sticking doors.

You also have a 14-day cooling-off period for contracts agreed at home, by phone or online. Paying part of the price by credit card can give you Section 75 protection, but it only covers contracts up to a set value, so check with your card provider whether a job of this size qualifies. If a dispute arises and you cannot settle it with the builder, Citizens Advice can explain your options.

Ways to keep the cost under control

The best way to control costs is to hire a reliable main contractor and avoid cowboy builders who take on more jobs than they can staff. You should ask to visit their finished jobs and ask for proof of their employers' liability and public liability insurance.

Look for tradespeople connected to official schemes. The Federation of Master Builders vets and independently inspects members. TrustMark is the government-endorsed quality scheme. Gas work needs a Gas Safe registered engineer and electrical work a registered electrician. You should confirm membership on the scheme's own register and treat it as a good sign, not a guarantee.

To protect your budget, you must avoid the common mistakes and scams in this trade.

  • Choosing a builder on price alone without looking at their past projects.
  • Starting the build without detailed drawings, a written specification or a signed contract.
  • Handing over large cash deposits before any tools or materials appear on site.
  • Accepting a rough estimate as if it were a legally binding fixed quote.
  • Changing the design mid build without agreeing the new costs in writing first.
  • Allowing cowboy builders to convince you that building regulations are not needed for a habitable room.
  • Agreeing to cash deals offered without VAT or proper paperwork.
  • Paying the final instalment before snagging is complete and all certificates are in your hand.

Changing your mind during the build leads to variations. Variations are changes after the price is agreed, and builders charge a premium for them because they disrupt the schedule. Finalise your design before you sign the contract.

Common questions

How much is a loft conversion per square metre?

Builders do not quote based on a flat rate, but a rough guide outside London is £1,800 to £3,800 per square metre. This figure depends entirely on the type of roof alteration and the quality of the finish. For more on how per square metre figures work, read our guide to house extension cost per square metre.

Do I need to tell my home insurer about the work?

Yes, you should tell your home insurer before you start a loft conversion. Structural work changes the risk to your property, and if your insurer does not know about it you may not be covered if something goes wrong during the build.

What is a lawful development certificate?

A lawful development certificate is a legal document from your council proving that your project falls under permitted development and does not need full planning permission. It costs half the normal planning fee and is useful evidence when you come to sell the house.

Can I board my loft for use as a room without approval?

No. You cannot board a loft and use it as a liveable space or bedroom without building regulations approval. The existing joists are there to tie the roof together and hold up the ceiling below, not to carry furniture and people, so the floor needs proper structural upgrading first.

Next steps for your project

Before you invite builders to quote, you need to get your paperwork in order. Taking the right steps early will save you thousands of pounds in variations and delays later on.

  1. Ask a designer or loft specialist to check that the ridge height meets the 2.2 to 2.3 m rule of thumb.
  2. Hire an architect or designer to draft your plans and submit them to the council for a lawful development certificate or planning permission.
  3. Commission a structural engineer to calculate the sizes of the steel beams and timber joists needed.
  4. Serve notice to your neighbours under the Party Wall etc. Act 1996 if you share a boundary wall.
  5. Send your completed drawings and a detailed specification to three local builders to get fixed written quotes.

Once you have your approved plans and structural calculations in hand, you are ready to find a builder near you to turn the drawings into a reality.

Find a top rated builder near you

3,554 builders across the UK, each ranked on their Google rating and the number of reviews behind it. Start with your county:

All counties and towns · The UK Top 100 builders

Sophie Clarke
Written by
Sophie Clarke Writer

Sophie researches and writes guides for Top Rated Builders, turning prices, rules and official guidance into plain advice for homeowners. She is slowly working through every Agatha Christie novel.