How Much Should You Pay a Builder Upfront?

How much deposit to pay a builder in the UK, why Citizens Advice says no more than 25 per cent, how stage payments and holding back a final sum work, and how to pay safely.

Illustration of staged payments shown as steps beside a house under construction

Citizens Advice says you should not agree to more than 25 per cent as a deposit and you should never pay everything up front. For larger jobs many builders and guides suggest a smaller deposit and payments tied to clear stages of progress. The safest approach is to agree a small upfront amount to secure the date and keep control of your money as the build moves forward.

What a builder deposit actually covers

A deposit serves two main purposes when you hire a general builder or main contractor. It secures your start date in their schedule and it covers the cost of the first materials needed on site. The exact amount must always be written clearly in your contract before any money changes hands.

If the deposit is mostly to cover materials, you can offer to buy those materials yourself instead of paying a deposit for them. This keeps your money safe and ensures the supplies are delivered directly to your property ready for the work to begin.

Whenever you hand over money before work begins, you must always get a receipt for the deposit. You should also ask for receipts for any materials the deposit covers. This proves exactly what you have paid and what the money bought in case there is a dispute later.

The 25 per cent limit and typical deposit amounts

The official guidance from Citizens Advice states you should not agree to more than 25 per cent as a deposit. That is the upper limit Citizens Advice gives, and a smaller deposit is often easier to justify.

Published advice recommends a deposit of 10 per cent on signing the contract and flags builders who ask for more than 10 to 15 per cent upfront as a red flag. That is one view, not a rule.

You will see different approaches depending on who you hire. Trade answers on one site from June and July 2026 range from no deposit on small labour-only jobs to a 10 per cent deposit on jobs over 5,000 pounds. Others ask for 25 per cent to secure the job or even 50 per cent upfront with the rest on completion. These are individual tradespeople's answers, not rules, so use them only to see why you should compare quotes carefully.

Using stage payments to manage the cost

Paying in stages is a good idea because it means problems can be put right before you make the final payment. Instead of handing over large lump sums, you release money only when specific parts of the build are finished. This keeps the builder motivated and protects your budget if they walk away.

You need to agree a clear schedule of works before you start. This is a document that lists everything that will happen in order. Your stage payments are then tied directly to this schedule.

This table shows one published example of a payment schedule from a planning guide.

Stage of work

Percentage of total cost

Signing the contract

10 per cent

Foundations finished

15 per cent

Walls up to plate level or roof structure

20 per cent

Roof complete with windows fitted

15 per cent

First fix

15 per cent

Second fix and decoration

15 per cent

Completion and snagging

10 per cent

This is one published example rather than a rule, and it is not a Citizens Advice figure. Your own schedule depends on the design and the job.

The schedule mentions first fix and second fix. First fix means the hidden carpentry, pipes and wires installed before the walls are plastered. Second fix covers everything that comes after plastering, such as fitting sockets, doors and skirting boards. The stage for the roof and windows is about making the building weathertight so the internal trades can start.

When you are planning a house renovation step by step, setting out these payment stages early is the best way to keep the project on track.

Holding back the final payment for snagging

The final stage of any building project is called snagging. This is when you check the finished work for minor faults, missing parts or poor finishes. You should not pay the final instalment before snagging and certificates are done.

The published schedule above shows a 10 per cent retention. This means holding back the last 10 per cent of the money until all the snags are fixed. Once the builder corrects the minor defects, you pay the final balance.

This final payment must also depend on receiving your paperwork. A completion certificate matters when selling your home so you must not hand over the final payment without it. Without it you may not have the certificates of compliance you need to sell.

How to pay and why cash is risky

You should pay for the work by debit or credit card if you can. You must avoid traders who only accept cash or want you to pay everything upfront. Cash deals offered without VAT or paperwork leave you with little proof of what you paid for.

If you pay by credit card for work that costs between 100.01 and 30,000 pounds, you might be able to claim from your card provider under Section 75. This can give you a way to claim from the card provider if something goes wrong, but check the rules with your card provider.

This Section 75 protection includes paying a deposit by credit card even if that deposit is less than 100 pounds. You might still be able to claim if the total cost of the work falls within the limits.

If you pay by credit or debit card you might also be able to get your money back through the chargeback scheme. Cash and bank transfers are not covered by these rules so paying directly from your bank account gives you fewer options if something goes wrong.

Protecting your deposit before work starts

Before you hand over any money you should check if the trader has insurance to protect your deposit.

Alternatively the deposit can be held in a neutral account belonging to an escrow company. An escrow company holds the money in a neutral account that belongs to the company. If you use this method you should check the escrow company is registered with the Financial Conduct Authority.

You can also look for builders who belong to official schemes. The Federation of Master Builders vets and independently inspects its members. TrustMark is the government-endorsed quality scheme. You should confirm membership on the scheme's own register and treat it as a good sign, not a guarantee of perfect work.

You must also ensure the right people are doing the specialist work. Gas work needs a Gas Safe registered engineer and electrical work needs a registered electrician. The main contractor will usually bring in these subcontractors but you should check their credentials before paying for those stages.

Contracts, quotes and your right to cancel

Starting without drawings, a specification or a written contract is a fast way to lose money. A specification is a detailed list of exactly what materials and finishes will be used. You should always try to get a contract in writing before you tell the trader you would like them to do the work.

You must understand the difference between a quote and an estimate before you accept a price.

Feature

Quote

Estimate

Meaning

A fixed price for the work

A rough guess of the cost

Binding agreement

Binding after you say yes

Not a fixed legal price

Final cost

Stays the same unless the design changes

You might end up paying more

A quote is a fixed price and an estimate is just a rough guess so you might end up paying more. After you say yes to a quote it is a binding agreement whether it is written down or not.

A proper quote and contract should contain several key details.

  • A fixed total price including VAT at 20 per cent.
  • A clear schedule of works showing what happens in order.
  • The exact deposit amount and a schedule of stage payments.
  • A detailed specification of the materials to be used.
  • A timeline showing the agreed start date and expected finish.

You might be able to cancel the contract if you change your mind within 14 days. The 14 days start when you tell the trader you would like them to do the work or sign a written contract. This applies to contracts agreed at home, by phone or online. If you asked for the work to start within those 14 days you might have to pay for some or all of it.

Managing changes and extra costs

Builders price from drawings and a specification, not from a cost per square metre. Per square metre figures are only a way to set an early budget and published figures differ widely because some cover a basic shell and others a finished room. While a house extension cost per square metre gives you a rough idea, your fixed quote is what matters.

Your quote will normally exclude certain items. Kitchens and bathrooms, flooring and decoration, professional fees, planning and building control fees, and party wall costs are usually outside a build quote. Labour is a large share of any job and London and the South East cost more.

During a build you might want to change the design or add new features. These changes are called variations. Changing the design mid build without agreeing the cost in writing is a common mistake. You must always ask for a revised quote for the variation before the extra work begins.

Your quote might also include provisional sums. These are allowances for things that cannot be priced yet, such as a specific type of brick you have not chosen. You should also keep your own contingency fund in the bank. A contingency is a spare pot of money to cover unexpected problems hidden in the ground or walls.

Permissions and rules to check before paying

Before you pay a deposit you must know if your project is legal. Planning permission and building regulations are two separate systems and many projects need one, both or neither. Scotland and Northern Ireland have their own systems so you must check locally if you live there.

Many extensions and loft conversions on houses fall under permitted development, within set limits on size, height and position. Flats and maisonettes do not have these rights. Conservation areas, listed buildings and properties with planning conditions are more restricted. A lawful development certificate gives written proof that a project is permitted development.

Larger single-storey rear extensions can go through a process called prior approval. In England the householder application fee for planning permission is 548 pounds from 1 April 2026. Most applications are decided within 8 weeks and work must start within three years of permission being granted. In Wales work must start within five years.

Building regulations approval comes from council building control or a registered building control approver, or through a competent person scheme for certain trades. Councils can now take enforcement action for up to ten years if you break these rules. Our guide to building regulations for home improvements explains more.

You must also handle structural and safety rules. Structural work may need a structural engineer's calculations, and builders can use these when they quote. The Party Wall etc. Act 1996 applies in England and Wales to work on or near a shared wall or boundary. Under the CDM Regulations 2015 a domestic client's health and safety duties normally pass to the builder. Finally, houses built or refurbished before 2000 may contain asbestos, which must be dealt with by competent people.

Warning signs of a rogue builder

Choosing on price alone is dangerous. Cowboy builders can quote a very low price to win the job and then ask for a large deposit. Citizens Advice warns about traders who do not turn up.

There are several clear warning signs of a rogue builder.

  • Asking for everything up front before work begins.
  • Offering a lower price for a cash deal without VAT or paperwork.
  • Telling you that building regulations are not needed for structural work.
  • Starting work without drawings or a written contract.
  • Taking on more jobs than they have the staff to complete.

Be wary of cowboy builders who juggle too many sites. Large upfront payments are a reason to ask more questions. If things go wrong, Citizens Advice is the signpost for disputes and consumer rights.

Common questions

Do I have to pay a deposit for a small repair?

Some tradespeople do not ask for any deposit on small labour-only jobs, according to answers on one site. Whatever you agree, get the terms in writing.

What happens if the builder asks for 50 per cent upfront?

Asking for half the money upfront is a risk to you. Citizens Advice says you should not agree to more than 25 per cent. You can offer to buy the materials directly instead or suggest a smaller deposit with staged payments.

Can I get my deposit back if I cancel?

You might be able to cancel the contract and get your money back if you change your mind within 14 days. However if you asked the builder to start work within those 14 days you might have to pay for the work they have already done.

Is it safe to pay a builder by bank transfer?

Paying by bank transfer means you do not get Section 75 protection. Paying by credit card can give you more options because you might be able to claim from your card provider.

Your next steps

Set up your project safely by following these rules before you hand over any money.

  • Get three written quotes against the same drawings and specification.
  • Ensure you have a fixed quote in writing rather than an estimate.
  • Agree a deposit of no more than 25 per cent.
  • Write a clear schedule of stage payments tied to progress on site.
  • Check that your trader has insurance to protect your deposit.
  • Pay by credit or debit card to protect your money.

When you know what your project involves and you have your drawings ready, you can start speaking to local firms. You can find a builder near you to request written quotes and compare their payment schedules before you commit.

Find a top rated builder near you

3,554 builders across the UK, each ranked on their Google rating and the number of reviews behind it. Start with your county:

All counties and towns · The UK Top 100 builders

Rachel Dawson
Written by
Rachel Dawson Writer

Rachel writes for Top Rated Builders, with a focus on helping homeowners compare quotes and ask the right questions. Away from the desk, she runs a book club with friends.

Looking for a trusted builder? Browse our verified listings.

Find a Builder