A proper quote is a fixed total price to complete a defined set of work, while an estimate is just a rough guess that will probably change. When you compare builder quotes, you need to check them against the exact same drawings and specification to see what is missing. The cheapest quote is not necessarily the best, and it may leave out items like waste removal or scaffolding.
Quote or estimate and how to know which you have
According to Citizens Advice, a quote is described as a promise from the trader to do the work at an agreed price. This means the total is a fixed price, not a daily rate. An estimate is just a rough guess, so you might end up paying more as the job progresses. Get the price in writing, since a verbal quote is not enough.
Once you accept a written quote, the builder cannot charge more unless you request extra work. They can also charge more if you agree to pay for extra work after being told about it, or if the trader made a genuine calculation or writing mistake. This is why you must check every single line carefully before you sign anything. If a builder hands you a piece of paper that says estimate, ask them to turn it into a firm quote before you agree to proceed.
What a proper quote includes
Builders price from detailed drawings and a specification, which is a written list of materials and standards. They do not price from a cost per square metre. Per square metre figures are only a way to set an early budget and figures differ widely because some cover a basic shell and others a finished room. To get an accurate price, your paperwork must explain exactly what the builder is expected to build.
The Federation of Master Builders says a professional quote should list the full scope of work clearly. It should break down the labour and materials so you know exactly where your money is going. If you are reading a proper quote, it will include the following details.
- The full scope of work and a breakdown of work and materials
- Labour and materials costs separated
- VAT where applicable
- What fixtures and finishes are included
- Anything specifically excluded from the price
- Allowances or provisional costs for unknown items
- Waste removal and responsibility for specialist trades
- Anticipated start date and duration
Citizens Advice also says a quote should state how long the price is valid, whether VAT is included and when the price can change. A detailed breakdown protects you from hidden costs such as skip hire and permits. These missing items often inflate the budget if the quote does not define what is included from the very beginning. The document should also explain how payment stages will work and how additional or changed work will be communicated and priced.
Get at least three and compare like for like
Citizens Advice warns that you should try to get written quotes from at least 3 different traders before you decide on one. Which? advice also states you should contact at least three builders whatever the size of the job. Ask each builder for a site visit before they price the job. Do not agree to work on the spot or over the phone.
When the prices come back, you must compare them against the same drawings and schedule of works. A schedule of works is a detailed list of every task required to finish the project in order. This is the only way to spot if one builder has left out a major cost. A general builder or main contractor will usually bring in subcontractors to do the plumbing and electrical work. Check that their quotes cover these trades for both the first fix and second fix stages. First fix is the hidden wiring and pipes, while second fix includes the visible sockets and taps.
Builders often use stage payments so you pay for the work as it progresses, followed by a final payment on completion. The Federation of Master Builders says a 10 per cent deposit is reasonable, but do not pay more than 25 per cent upfront. If one quote asks for a massive deposit, that is a clear warning sign. You can read more about how much to pay a builder upfront to protect your money throughout the build.
The items most often missing
Even with drawings, quotes can look very different because builders assume different things about the final finish. Which? recommends that written quotes must include materials, scaffolding, waste disposal and making good. Making good means repairing the plaster and paintwork around the new construction so the room is ready to use. If a quote leaves this out, you may face an extra cost for it later.
Certain major costs are normally outside a standard build quote unless you specifically ask for them. These include kitchens and bathrooms, flooring and decoration, professional fees, planning and building control fees, party wall costs and VAT at 20 per cent. London and the South East cost more for both labour and materials. Labour is a large share of any job, so a quote that misses out a subcontractor will look artificially low.
You must also check if the builder has included the structural engineer calculations in their price. Building regulations approval is needed for extensions, loft conversions and most structural and services work. The completion certificate matters when selling your home. Councils can now take enforcement action for up to ten years.
Provisional sums and allowances
A provisional sum is an allowance for things that cannot be priced yet. Builders use these when you have not chosen a specific item, such as a kitchen counter or bathroom tiles. They also use them for groundworks where they cannot see how deep the foundations need to go until they start digging. The quote includes a guessed amount to keep the total realistic.
Two quotes with different provisional sums are not comparable. If one builder puts in a low allowance for tiles and another puts in a high one, the first will look cheaper on paper. You will still have to pay the real price of the tiles you choose. Always check the provisional sums and ask the builders to adjust them so they match.
You should also keep a contingency fund separate from the quoted price. This is your own emergency money for unexpected problems or variations. Variations are changes made after the price is agreed, such as moving a wall or adding a window. The Federation of Master Builders says a good quote explains how additional or changed work will be communicated and priced in advance.
When a price is far below the others
Choosing a builder on price alone is one of the most common mistakes homeowners make. Citizens Advice warns you to be cautious of a quote far below others, or a trader who will not put a quote in writing. The cheapest quote is not necessarily the best, so check what each quote includes before you decide. Cowboy builders who take on more jobs than they can staff are a common risk in this trade.
The Federation of Master Builders lists a price dramatically below comparable quotes as a major red flag if the builder cannot explain why. They also warn against builders who ask you to pay cash to avoid VAT. Be wary of cash or VAT-free deals. The Consumer Rights Act 2015 requires tradespeople to use reasonable care and skill, and to charge a reasonable price and take a reasonable time where none was agreed.
Other red flags from the Federation of Master Builders include builders who are vague about costs or timescales. You should also avoid anyone who puts you under pressure to decide immediately or will not provide a detailed written quote. A professional builder will give you time to read the quote and check their references. Be wary of anyone who guarantees there will be no unexpected costs on work where genuine uncertainties remain. You can read more on how to find a good local builder if you need to start your search again.
Questions to ask when quotes differ
When you have three quotes and the totals are wildly different, you need to ask the builders to explain their numbers. Look at the breakdown and see if they have included the cost of making the building weathertight. Making the building weathertight means getting the roof on and the windows in so the interior is protected from the rain.
Ask these questions to find out why one quote is higher or lower than the others.
- Who exactly will be on site managing the project every day?
- Are the plumbing and electrical subcontractors included in this price?
- What happens to the total if I change my mind about the design?
- Is the cost of skip hire and waste removal covered?
- Do you have employers liability and public liability insurance?
If a builder is vague about who will actually carry out the work, treat it as a warning sign. You should also ask to see proof of their insurance and check they have told their home insurer about the project. Houses built or refurbished before 2000 may contain asbestos, which must be dealt with by competent people. Never try to remove asbestos yourself and always ask the builder how any suspected asbestos will be dealt with.
What a building contract should include
Accepting a quote is only the first step. You must turn that agreed price into a written contract before any work begins. Starting without drawings, a specification or a written contract is a huge risk. A proper contract protects both you and the builder by putting all the rules in one place.
The table below shows the deposit and retention figures the Federation of Master Builders gives. Retention is a small percentage of the total price that you hold back until the work is completely finished and checked.
|
Payment stage |
Typical figure |
|---|---|
|
Reasonable deposit |
10 per cent |
|
Maximum deposit |
25 per cent |
|
Retention held back |
2.5 per cent to 5 per cent |
Retention is often around 2.5 to 5 per cent, and the terms for your project should be agreed in writing. The Federation of Master Builders says a building contract should include the scope of works, a payment schedule tied to stages and a timeline. It must also include a change order process where any change to the scope is documented and costed in advance. It should cover dispute resolution and warranties.
You should hold back the retention money for snagging. Snagging is the process of finding and fixing small defects at the end of the job. Paying the final instalment before snagging and certificates are done leaves you with no leverage to get the builder back. You can find out more about setting up a written contract with a builder to secure your project.
Planning and building rules to check
Planning permission and building regulations are two separate systems and many projects need one, both or neither. Many extensions and loft conversions on houses fall under permitted development, within set limits on size, height and position. Flats and maisonettes do not have these rights. Conservation areas, listed buildings and properties with planning conditions are also more restricted.
In England the householder application fee is 548 pounds from 1 April 2026. Most applications are decided within 8 weeks, and work must start within three years of permission being granted, or five years in Wales. A lawful development certificate gives written proof that a project is permitted development. Larger single-storey rear extensions can go through a faster route called prior approval.
Building regulations approval comes from council building control or a registered building control approver. It can also come through a competent person scheme for certain trades. Gas work needs a Gas Safe registered engineer and electrical work needs a registered electrician. The Federation of Master Builders vets and independently inspects members, while TrustMark is the government-endorsed quality scheme. You should confirm membership on the scheme's own register and treat it as a good sign, not a guarantee.
The Party Wall etc. Act 1996 applies in England and Wales to work on or near a shared wall or boundary. Under the CDM Regulations 2015 a domestic client's health and safety duties normally pass to the builder. If you buy goods or services at home, by phone or online, you have a 14-day cooling-off period. You also get Section 75 protection on credit card payments. Citizens Advice is the signpost for disputes. Scotland and Northern Ireland have their own systems, so you must check locally.
Common questions
Why are some quotes so much cheaper than others?
The cheapest quote usually leaves out essential costs like waste removal, scaffolding or making good. A low price can also come from cheap provisional sums for materials, which leave you paying more later. A very low price with no explanation is a red flag.
Should a builder quote include VAT?
A quote should say whether VAT is included, as Citizens Advice and the Federation of Master Builders both point out. If a builder asks you to pay cash to avoid VAT, it is a major red flag. Be wary of cash or VAT-free deals, and make sure everything is agreed in a written quote and contract.
Can a builder increase the price after giving a quote?
A quote is a fixed price and the builder cannot charge more unless you request extra work. They can also increase the cost if you agree to pay more after being told about extra work, or if they made a genuine calculation or writing mistake. This is why you must document and cost any design changes in writing before the work happens.
What is the difference between first fix and second fix?
First fix involves the structural work, pipes and wires that are hidden behind the walls and ceilings. Second fix covers everything you see and touch after the plastering is done, such as light fittings, sockets, taps and doors. Make sure your quote clearly includes both stages and the final testing.
Next steps for your project
Comparing quotes properly takes time, but it is the only way to protect your budget and your property. Take these steps to make sure you choose the right professional for your home.
- Check that your paperwork says quote and not estimate
- Read the breakdown to see if waste removal and scaffolding are included
- Look at the provisional sums and make sure they are realistic
- Ask the builder to explain any price that is dramatically lower than the rest
- Set up a written contract with stage payments and a retention sum
Once you know exactly what a good quote looks like, you can start speaking to local professionals with confidence. You can use our directory to find a builder near you and request three written quotes for your project.