Do You Need a Written Contract With Your Builder?

Do you need a written contract with your builder? What it should say, from scope and payment stages to changes, insurance and guarantees, and why it matters if something goes wrong.

Illustration of a contract sheet with a pen, a model house and a hard hat on a table

There is no legal requirement to use formal legal language when you hire a tradesperson. However, for anything beyond a very minor repair, a written building contract for home improvements is your best protection. It sets out exactly what you are paying for, when the work will happen and how you will manage any problems along the way.

Do you need a written contract?

You should always have a written agreement before handing over a large sum of money. If a dispute arises over a verbal agreement, it can be very hard to prove what was actually said. A written document removes that confusion and protects both you and the builder.

According to Citizens Advice, written contracts do not need legal language. They should simply set out what you are paying for and everything you have agreed. If a firm refuses to put things in writing, you should view that as a warning sign.

A good general builder or main contractor will expect to use a contract for an extension or major renovation. The Federation of Master Builders offers a Plain English template contract that you can request for larger jobs. Having a clear document means you have a baseline to check progress against.

Without a contract, you risk disagreements over hidden extras. You might assume the price includes taking away the rubbish or paying VAT at 20 per cent, while the builder might assume those are separate charges. Putting it all on paper forces both sides to agree on the details before the work begins.

What a contract does for you

A contract locks in a fixed price for a specific set of tasks. You should only sign one after you receive a proper quote, which is a fixed price, rather than an estimate, which is just an educated guess. The contract ties that quote to your drawings, specification and schedule of works.

The specification is a detailed list of exactly what materials will be used, while the schedule of works is a list of tasks in the order they will happen. The contract also clarifies who is responsible for the site. Under the CDM Regulations 2015, a domestic client's health and safety duties normally pass to the builder, and the contract should reflect this.

A contract also sets the boundaries for the project. It is also a good place to agree practical points such as working hours and access to your property.

Crucially, a contract defines what happens when things go wrong. It gives you a clear process to follow if the work is delayed or if you are unhappy with the quality. This is much easier than trying to negotiate a solution in the middle of a stressful build.

What to put in the contract

A comprehensive contract covers the scope, the timeline and the rules of the site. You need to capture every practical detail so nothing is left to chance. According to the Federation of Master Builders, a clear scope of works including materials and specifications is vital.

Citizens Advice states that your agreement should cover timings, tidying up, materials, equipment and subcontractors. You should list the start and finish dates, the number of working days if the firm charges a daily rate, and exactly how delays will be handled.

Your contract should include these key elements:

  • A realistic timeframe with buffer periods for bad weather or material delays.
  • Details of tidying up, including how and when rubbish is removed and who pays for skips.
  • Rules on materials and equipment, stating who pays for them and who keeps the receipts.
  • Whether subcontractors will be used by the main contractor.
  • A payment schedule with payment milestones tied to project completion stages.
  • A clear dispute resolution process.
  • Warranties covering materials and workmanship.

If your project involves structural work, ask the builder to say in the contract whether structural engineer's calculations are needed. If the job involves gas, the contract should state that a Gas Safe registered engineer will do the work, and electrical work needs a registered electrician.

Payment stages and retention

Payment terms cover how and when you will pay. You should never pay the whole amount upfront. If the work is long, Citizens Advice says you should keep deposits as low as possible and not agree to more than 25 per cent. Always get a receipt for any money you hand over.

The Federation of Master Builders says a 10 per cent deposit is reasonable, but you should not pay more than 25 per cent. You can learn more about this in a separate guide on how much to pay a builder upfront. Once the deposit is paid, the rest of the money should be split into stage payments.

Stage payments are tied to progress. You might pay one instalment when the foundations are poured, another when the building is made weathertight, and another after the first fix. First fix means the hidden pipes and wires, while second fix covers the visible sockets, switches and taps.

You should also hold back a final amount until the job is completely finished. The Federation of Master Builders says it is reasonable to retain 2.5 per cent of the contract value for a three to six month snagging period. Snagging is the process of finding and fixing small defects, like a sticking door or cracked plaster. You pay the final instalment once the snagging is complete.

Changes to the work

Almost every building project changes once it starts. You might uncover bad pipes, or you might decide you want different tiles. These changes are called variations. Your contract must include a change order process to manage them.

A change order is a formal document that acts as an amendment to the original agreement. The Federation of Master Builders warns that poor change management is a common pitfall. You must agree the cost of any extra work in writing before the builder actually does it.

Your quote might also include provisional sums. These are allowances for things that cannot be priced yet, such as a specific kitchen worktop you have not chosen. The contract should explain how these sums will be adjusted once the final price is known.

You should also keep a contingency fund. This is a pot of your own money kept aside for surprises. It is not part of the contract price, but it ensures you can afford any change orders that become necessary.

Insurance and guarantees

Things can go wrong on a building site, so you need to know who pays if a pipe bursts or a wall cracks. Citizens Advice says you should ask what insurance the trader holds and ask to see the policies.

This table shows the main types of insurance a builder should hold, based on guidance from Citizens Advice.

Insurance type

What it covers

Public liability

Injury to people or damage to property

Employers' liability

The trader's employees (a legal requirement if they have staff)

Professional indemnity

Faulty design or bad advice

Contractors' all-risk

Work damaged before completion

These are typical categories of cover, and the exact terms depend on the policy. You may also need to tell your own buildings insurer about the work before it starts, to ensure your home remains protected.

A guarantee is a promise to fix problems after the work is finished, and it sits alongside your legal rights. You should check how long it lasts, what it covers and whether it can pass to future owners. An insurance-backed guarantee means an insurance policy ensures the guarantee can still be honoured if the trader goes out of business.

Cooling-off rights

You might be able to cancel the contract within 14 days if you change your mind. This cooling-off period normally applies to contracts agreed at your home, by phone or online. The period starts when you ask the trader to do the work or sign a written contract.

If you asked for work to start within those 14 days, you may have to pay for some or all of it. The exact amount depends on when you cancel and how much work the builder has already done.

Rules differ for contracts agreed in other ways, so read the terms carefully to see what cancellation rights are written into the document.

Common mistakes to avoid

The Federation of Master Builders lists several common pitfalls when agreeing a contract. These include an unclear scope, unrealistic timelines, hidden costs such as waste removal and permits, poor change management and missing warranties.

Another major mistake is choosing a builder on price alone without a proper specification. If you just ask three builders for a price, they will all assume different finishes. You should always read a guide on how to compare builder quotes to ensure you are looking at like-for-like figures.

Do not let a builder tell you that building regulations are not needed. Building regulations approval is needed for extensions, loft conversions and most structural and services work, and it comes from council building control or a registered building control approver. The completion certificate matters when you come to sell your home, and councils can take enforcement action for up to ten years.

You should also avoid cash deals offered without VAT or paperwork. Large cash deposits are a common mistake, and cowboy builders take on more jobs than they can staff. Furthermore, older homes built before 2000 may contain asbestos, which must be dealt with by competent people, so do not let a builder rip out old materials without checking.

When to get a solicitor

For a small job, writing down what you have agreed is usually enough. However, for a large extension or a full house renovation, the sums of money are huge. In these cases, it makes sense to seek professional legal help.

The Federation of Master Builders suggests consulting a construction solicitor to tailor contract terms. A solicitor can ensure the document protects your specific project and handles complex issues like the Party Wall etc. Act 1996, which applies in England and Wales to work on or near a shared boundary.

A solicitor will also check that the payment schedule is fair and the dispute resolution process is robust. Paying for a few hours of legal advice is a small price compared to the cost of a building project going wrong.

Common questions

Does a contract cover planning permission?

Your contract should state who is responsible for securing the necessary permissions, but you cannot write a contract to bypass the law. Planning permission and building regulations are two separate systems, and many projects need one, both or neither. If your project falls under permitted development, a lawful development certificate gives written proof that it is allowed.

Can I write the contract myself?

You can write down what you have agreed, and as long as both parties sign it, it forms a basic written record. However, you should not try to invent complex legal clauses yourself. It is much safer to use a standard industry template or hire a solicitor to draft one for you.

What if the builder refuses to sign a contract?

The Federation of Master Builders states that a builder who will not use a written contract is a red flag. A reputable tradesperson will welcome a contract because it protects them just as much as it protects you. If they refuse, you should look for someone else.

Do I need a contract if I know the builder?

Yes. The Federation of Master Builders says larger jobs should have a written contract. A contract removes assumptions and ensures you both know exactly what the price covers and how long the work will take.

Next steps

Before you let a builder start work, you should get your paperwork in order. Taking a methodical approach will protect your money and your property.

  • Get a full set of drawings and a specification drawn up.
  • Ask for three written quotes based on those exact drawings.
  • Check the chosen builder's public liability and employers' liability insurance policies.
  • Agree a written contract that includes a timeline, a change order process and dispute resolution.
  • Ensure the payment schedule limits the deposit to 25 per cent or less, with a 2.5 per cent retention for snagging.
  • Confirm who is handling building control and any party wall agreements.

If you are ready to start planning your project and need quotes to compare, you can use our directory to find a builder near you.

Find a top rated builder near you

3,554 builders across the UK, each ranked on their Google rating and the number of reviews behind it. Start with your county:

All counties and towns · The UK Top 100 builders

Rachel Dawson
Written by
Rachel Dawson Writer

Rachel writes for Top Rated Builders, with a focus on helping homeowners compare quotes and ask the right questions. Away from the desk, she runs a book club with friends.

Looking for a trusted builder? Browse our verified listings.

Find a Builder