If your council has refused your householder application, they must give you written reasons for their decision. You have a 12-week window to appeal a householder refusal, though often the quickest route is to talk to the planning officer and change your scheme. This guide explains how to read the refusal notice, what a resubmission costs, and how to launch an appeal if you cannot reach an agreement.
First read the reasons for refusal
Local authorities are legally required to explain their decision. The Planning Portal states that if the authority refuses permission or imposes conditions, it must give written reasons. Look closely at the decision notice you receive from the council.
The letter should set out the reasons for the refusal and the planning policies the council relied on. Understanding exactly which of them applies tells you what needs to change.
Talk to the planning officer
Before you decide your next move, get in touch with the person who handled your application. The Planning Portal advises that if you are unclear about the reasons for refusal, you should talk to staff at the planning department. They can explain the written reasons in plain English.
The officer might also tell you what kind of design they would actually approve. Keep the conversation calm and professional. The goal is to find a compromise that gives you the space you need while satisfying the council policies.
- Ask which specific parts of the design caused the refusal.
- Ask if reducing the height or depth would change their decision.
- Ask if changing the exterior materials would help.
- Ask if they would support a revised application based on your discussion.
Option one, change the plans and resubmit
Amending the design is often the quickest way forward. Once you know what the planning officer objects to, you can ask your architect or designer to adjust the drawings. This might mean stepping a side extension back from the boundary or lowering a roofline.
You then submit these new drawings as a fresh planning application. Because you are working with the council rather than fighting them, this route can take less time than an appeal. Most planning applications are decided within eight weeks, or 13 weeks if they are unusually large or complex.
You can also explore whether your revised project might fall under permitted development rights. Many extensions and loft conversions on houses fall under permitted development, within set limits on size, height and position. Flats and maisonettes do not have these rights, and conservation areas, listed buildings and properties with planning conditions are more restricted.
You can confirm your rights by applying for a lawful development certificate, which gives written proof that a project is permitted development. Larger single-storey rear extensions can also go through prior approval, which follows the rules for larger home extensions.
What a resubmission costs
Submitting a new application usually means paying the planning fee again. Hastings Borough Council notes that the 2023 fees amendment regulations removed the right to a free go where a previous application was approved, refused or withdrawn. The transition period expired on 5 December 2024, meaning from 6 December 2024 onwards there will be no free go applications in England.
Your local council will confirm the exact fee for your new application. The Planning Portal states that in England the cost for a typical householder application is 548 pounds from 1 April 2026, while in Wales it is 585 pounds. The exact fee depends on the type and scale of your development.
You may also have to pay a Planning Portal service charge for online applications with a fee over 100 pounds. This is 99 pounds including VAT for Band 1, or 149 pounds including VAT for Band 2, though most applications are free or Band 1. Keep in mind that the application fee will generally not be refundable if your application is withdrawn or not determined.
Option two, appeal to the Planning Inspectorate
If you cannot reach a compromise with the council, you can challenge the decision. The Planning Portal notes that if you think the decision is unreasonable you may wish to consider appealing. GOV.UK states you can appeal a decision for an application you made yourself or on behalf of someone else, if you were refused permission for reasons you think go against the local planning authority development plan or planning policy.
An appeal takes the decision away from your local council and hands it to the Planning Inspectorate. The Planning Portal warns that appeals are a last resort and once you appeal the application is no longer in the authority's hands. Procedural guidance for appeals differs depending on whether your application was dated on or before 31 March 2026, or on or after 1 April 2026.
Appeal deadlines and how long an appeal takes
You must act quickly if you want to appeal. GOV.UK states you can appeal for up to 12 weeks from the date on the decision letter you got from your local planning authority. You have less time if you received an enforcement notice in the last two years.
If the enforcement notice came before the refusal, you have 28 days from the date on your decision letter. If the notice came after, you have whichever is sooner of 28 days from receiving the enforcement notice or six months from the date on your decision letter. Appeals take several months to resolve.
The Planning Inspectorate statistical release of 22 October 2026 shows timings for householder appeals decided by written representations in September 2026. From 278 decisions, the median time was 11.9 weeks and the mean was 13.7 weeks. The median time from valid to start was 0.9 weeks, from start to event was 7.4 weeks, and from event to decision was 3.0 weeks.
These are monthly figures and real appeals vary. You can also appeal for non-determination if the authority fails to decide in the statutory period and you have not agreed in writing to an extension.
Costs and risks of appealing
Appealing can also carry a financial risk if you behave unreasonably during the process. GOV.UK states you can apply for an award of costs if you believe the authority cost you money by behaving unreasonably.
The authority can also apply to get costs from you, and the same applies to either side if the other behaves unreasonably. The main risk is time, as waiting several months for a decision leaves your building project stalled.
Choosing between resubmitting and appealing
Deciding which route to take depends on how far apart you and the council are. If the planning officer only wants minor changes, resubmitting is usually the better choice. If the council objects to the entire principle of your extension and refuses to compromise, an appeal may be worth considering.
A planning consultant or architect can look at your refusal notice and give you an independent view on your chances. The table below compares the two options based on speed, cost, control and risk.
|
Factor |
Change and resubmit |
Appeal decision |
|---|---|---|
|
Speed |
Most applications are decided within eight weeks |
Median 11.9 weeks for written representations |
|
Cost |
548 pounds for a typical householder application in England |
Either side can apply for an award of costs if the other behaves unreasonably |
|
Control |
You work with the council to find a compromise |
The application is no longer in the authority's hands |
|
Risk |
Fee generally not refundable if withdrawn or not determined |
You could face costs if you behave unreasonably |
The figures in the table are typical figures, and real timings and costs vary.
Getting your building regulations sorted
Planning permission and building regulations are two separate systems and many projects need one, both or neither. Even if you win your appeal, you will still need building regulations approval for extensions, loft conversions and most structural and services work. This approval comes from council building control or a registered building control approver.
Certain trades can self-certify their work through a competent person scheme. Gas work needs a Gas Safe registered engineer and electrical work needs a registered electrician. You should confirm their membership on the scheme's own register and treat it as a good sign, not a guarantee.
When the work is finished, you will receive a completion certificate, which matters when selling your home. Remember that councils can now take enforcement action for up to ten years if building regulations were not followed. If your project involves work on or near a shared wall or boundary, the Party Wall etc. Act 1996 applies in England and Wales.
If your house was built or refurbished before 2000, it may contain asbestos. This must be dealt with by competent people, so never attempt to remove it yourself. Scotland and Northern Ireland have their own systems, so check locally if you live there.
Preparing your paperwork for the builders
Once your planning refusal is overturned or a new design is approved, do not rush straight into hiring a general builder. This is the main contractor who manages the project and brings in the specialist subcontractors. Starting without the right paperwork is a common mistake that leads to disputes.
Builders price from drawings and a specification, which is a detailed document listing the exact materials and standards required. You also need a schedule of works, which is a list of all the tasks to be done in order. Per square metre figures are only a way to set an early budget, and figures differ widely because some cover a basic shell and others a finished room.
For structural changes, you also need a structural engineer's calculations. These prove to building control that your new steel beams or foundations are strong enough to support the weight. Getting these documents ready ensures your builders are quoting for exactly the same work.
How builders price the work
A good builder will use your drawings and specification to give you a fixed quote. Remember that a quote is fixed and an estimate is not. Accepting an estimate as if it were a quote is a fast way to lose control of your budget. Labour is a large share of any job, and London and the South East cost more.
Make clear what is normally outside a build quote. You will usually need to budget separately for these items.
- Kitchens and bathrooms
- Flooring and decoration
- Professional fees for architects and engineers
- Planning and building control fees
- Party wall costs
- VAT at 20 per cent
Your quote will often be broken down into stages. Making the building weathertight is a major milestone, meaning the structure is protected from the rain and wind with a roof and windows. The work is then split into first fix, which covers the hidden structural work, pipes and cables, and second fix, which involves the visible finished elements like plastering, sockets and doors.
The quote may include provisional sums, which are allowances for things that cannot be priced yet, like your final choice of tiles. You should also hold your own contingency, which is a spare budget for unexpected issues. Beware of variations, which are changes after the price is agreed. Changing the design mid-build without agreeing the cost in writing is a common way budgets spiral out of control.
Consumer protection and common mistakes
When hiring your builder, check their credentials. The Federation of Master Builders vets and independently inspects members. TrustMark is the government-endorsed quality scheme. Treat membership of these schemes as a good sign, not a guarantee.
Under the Consumer Rights Act 2015, tradespeople must provide work with reasonable care and skill, and for a reasonable price and time where none was agreed. You also have a 14-day cooling-off period for contracts agreed at home, by phone or online. If you pay any deposits by credit card, you get Section 75 protection. Citizens Advice is the signpost for disputes.
Never choose a builder on price alone. Avoid large cash deposits and beware of cash deals offered without VAT or paperwork. Cowboy builders often operate this way and take on more jobs than they can staff. Under the CDM Regulations 2015, a domestic client's health and safety duties normally pass to the builder.
Set up stage payments tied to progress and hold back a final payment on completion. Never pay the final instalment before snagging is complete. Snagging is the process of finding and fixing minor defects at the end of the build. You must also remember to tell your home insurer about the planned work before it starts.
Common questions
What happens if I build without permission?
Building work that needed permission and was refused carries a risk of council enforcement action. Do not start work until you have confirmed with your council what is allowed.
Can I appeal if the council takes too long?
Yes, you can launch an appeal for non-determination. This applies if the authority fails to decide in the statutory period and you have not agreed in writing to an extension. Most planning applications are decided within eight weeks, or 13 weeks if they are unusually large or complex.
Does a refusal mean my project is impossible?
Not necessarily. Talking to the planning officer about what would be acceptable is the best first step. If you are wondering whether you need planning permission for a slightly smaller version, confirm with your council. Changing a design does not guarantee approval.
Will I get my application fee back?
Generally not if the application is withdrawn or not determined. The Planning Portal states that the application fee will generally not be refundable in those cases, so ask your council what applies to you.
Next steps
Having planning permission refused is frustrating, but you have clear options to keep your project moving. Follow these steps to decide how to proceed.
- Read the decision notice carefully to understand exactly which policies your design failed to meet.
- Contact the planning officer to discuss the reasons and ask what changes they would accept.
- Ask your architect or designer if the suggested changes work for your home and budget.
- Check the calendar to ensure you do not miss the 12-week deadline if you decide to appeal.
- Choose whether to submit a fresh application or hand the decision to the Planning Inspectorate.
Once your permission is finally granted, you will need a detailed specification and building regulations approval before work starts. When you are ready to get accurate prices for the build, you can find a builder near you to quote on your approved drawings.
Find a top rated builder near you
3,554 builders across the UK, each ranked on their Google rating and the number of reviews behind it. Start with your county: