How to Snag Building Work Before You Make the Final Payment

How to run a snagging inspection on extension or renovation work: when to do it, what to check, what paperwork to collect, how retention works and what the law says about poor workmanship.

A newly finished room with a clipboard and pencil resting on the windowsill.

Before you pay the final bill for your extension or renovation, you need to walk through the work with your builder, agree a written snagging list and collect all your certificates and documents. Snagging is the process of finding small faults or unfinished items at the very end of a project. A snag is a small fault or unfinished item, and a good builder will come back to fix snagging issues like faults and problems you spot after the work is done. The Federation of Master Builders, which vets and independently inspects members, advises completing a formal inspection and agreeing any remaining snagging work before you make the final payment.

What snagging is and why it comes before the last payment

Snagging happens right at the end of a building project when the main construction is finished and the rooms are decorated. You are looking for minor issues that need to be put right before you sign off the job. It could be a door that sticks, a missing line of sealant, or a light switch that is not sitting flush against the wall.

Your contract should lay out your stage payments and a final payment on completion. This final payment is your strongest lever for getting defects fixed, and you should never hand over this last amount until you have checked the property. Once you have paid the final bill in full, it becomes much harder to get a busy builder to return for small cosmetic fixes.

The Federation of Master Builders advises that before making the final payment, you complete a formal inspection and agree on any remaining snagging work. When the work is complete, you should have walked through the project with your builder, received any certificates, warranty documents or instructions, and discussed how to deal with snagging items before you pay the final bill. Doing this formally protects both you and the builder from arguments later.

Agree the snagging process in your contract

The best time to plan for snagging is before the building work even starts. An agreement to address snagging issues should be outlined in your contract. Before the project ends, you and your builder should agree how snagging and handover will be managed.

You should ask for a realistic programme showing important stages, including:

  • Important decisions you need to make on materials
  • Inspections by building control
  • Deliveries of large items like windows
  • Stage payments and the final payment on completion

Builders price from drawings and a specification, not from a cost per square metre. Your drawings show the layout, while the specification and schedule of works list the exact materials and tasks required. Having these documents in your contract gives you a clear benchmark to check the finished work against during your snagging walkthrough.

Your contract should also detail how you will handle variations (changes after the price is agreed) and provisional sums (allowances for things that cannot be priced yet). Keep your own contingency fund for unexpected costs, so that you are not tempted to dip into the money set aside for the final payment. The guide on paying a builder upfront covers how payments are usually staged.

Do a joint walkthrough with your builder

When the builder says the job is finished, arrange a time to walk through the property together. Clients often find it hard to raise issues and can become defensive, which makes the end of a project stressful. A snagging and defects list before or at completion with a joint inspection makes sense because it allows you to point out problems calmly and agree a solution on the spot.

Do your walkthrough in daylight so you can see the finish clearly. Take your drawings, specification and schedule of works with you to confirm that everything you paid for has been installed. Go room by room and write down every snag you agree on, creating a single master list that both you and the builder have a copy of.

Your general builder or main contractor will oversee the site, but they will bring in subcontractors for specific trades like plumbing and plastering. Under the CDM Regulations 2015, a domestic client's health and safety duties normally pass to the builder, which concerns health and safety on site rather than the standard of the finish. Raise your snags with your main builder, who normally arranges for any subcontractor to return.

What to put on your snagging list

A snagging list should be reasonable and focus on the final finish of the property. You are looking at the second fix, which covers the visible fittings like doors, skirting boards, sockets and radiators. You cannot check the first fix, which covers the pipes and cables hidden behind the walls, by eye, so concentrate on what you can see and use.

You will also not be checking the structural engineer's calculations during this walkthrough. Those calculations are part of the building regulations process, not your walkthrough. Your focus now is purely on the cosmetic finish and making sure everyday items function correctly.

The table below shows the common areas to look at when building your snagging list.

Area

What to look at

Finish

Check the paintwork for drips, patchy areas and chips. Look for smooth plaster and neat sealant around edges.

Doors and windows

Ensure every door and window opens and closes smoothly without catching. Check the locks and handles feel secure.

Electrics

Look at whether sockets and switches sit straight and undamaged, and use the light switches as normal. Report anything that does not work to the builder and do not open or touch any wiring.

Heating and plumbing

Turn on the taps to check the water flow and drainage. Feel the radiators to ensure they are heating up evenly.

Floors

Walk across the floors to check for loose boards, squeaks or gaps in the finish.

Keep the list reasonable, so that the builder can deal with it in one return visit.

The paperwork to collect at handover

A building project is not finished until you have all the correct paperwork in your hands. You must make sure you receive the documents that apply to your work, and you should confirm with your builder when you can expect them. Without these documents, you may find it harder to sell the property in the future.

You must make sure you receive the documents that apply to your work, which usually include:

  • Your building regulations completion certificate
  • Certificates from Competent Person Schemes where your work needed them
  • Warranty documents that apply to your work
  • Product instructions for your new fittings

Building regulations approval is needed for extensions, loft conversions and most structural and services work. It comes from council building control or a registered building control approver, and councils can now take enforcement action for up to ten years if you do not have it. Gas work needs a Gas Safe registered engineer and electrical work needs a registered electrician, so you should treat their membership on the scheme's own register as a good sign, not a guarantee.

If your project involved the Party Wall etc. Act 1996, which applies in England and Wales to work on or near a shared wall or boundary, keep all your signed agreements safe. TrustMark is the government-endorsed quality scheme, so if your builder is a member you can confirm that on the scheme's own register. Keep it with your building regulations completion certificate.

Retention and holding back the final payment

A retention or defects-stage payment means a small proportion of the price is paid after completion or the defects period. Retention is often around 2.5% to 5%, but the amount and release point should be agreed clearly in the contract. This gives the builder a financial reason to return and finish the snagging list promptly.

Retention is entirely optional and has to be agreed at the start of the project. You cannot simply impose a retention fee at the end of the job if it was not in your written agreement. Holding back money without a clear right in your contract could cause a dispute, so get advice first.

Never withhold a random sum of money because you are unhappy with a snag. The final payment must be handled exactly as your contract dictates, paying the balance once the agreed snags are fixed. If you end up in a dispute about money or the standard of the work, you should speak to Citizens Advice for guidance.

Snags versus bigger defects

It is completely normal for a new extension or loft conversion to have a few snags. Houses move and settle, and plaster takes time to dry completely. A snagging list is meant to capture these minor, expected issues so the builder can address them in one final visit.

Bigger defects are a different matter and usually mean the work has not met the required legal standard. Under the Consumer Rights Act 2015, any work must be done with reasonable care and skill. This means the trader should have done a good job that is worth the amount they are charging you.

A quote is fixed and an estimate is not, so if you agreed a fixed price for a specific standard of work, the builder must deliver it. The law also expects a reasonable price and time where none was agreed. If a wall is built in the wrong place or the roof leaks, this is a major defect rather than a snag, and should be raised with the builder in writing as more than a snag. Citizens Advice can explain your options.

What your rights are if the builder does not come back

If your builder ignores your snagging list and refuses to return, you have rights under the Consumer Rights Act 2015. You can ask them to fix the problem if they also provided goods, and the trader should do so within a reasonable time without too much inconvenience. Give them a reasonable chance to put the work right, and keep a written record of what you asked for.

Citizens Advice suggests you could ask for money off for any inconvenience caused, giving 5% off the cost as a goodwill gesture as an example. Once a refund is agreed, the law says you should get your refund within 14 days.

The Citizens Advice guidance does not cover withholding payment for faulty work, so you should not take that step without professional advice. If you originally agreed your contract at home, by phone or online, you also had a 14-day cooling-off period at the start of the project, and you may have Section 75 protection on credit card payments. For any ongoing disputes, you should read the guide on how to complain about a builder and contact Citizens Advice.

Common questions

Can I withhold my final payment for snagging?

You can only hold back a retention payment if you agreed it in your written contract before the work started. Retention is often around 2.5% to 5%, but you cannot just impose this at the end of the job. If you have a dispute about money and your contract does not include a retention clause, send your query to Citizens Advice.

How long does a builder have to fix snags?

The law states that a trader should fix problems within a reasonable time and without causing you too much inconvenience. You should agree a clear timeline for the repairs during your joint walkthrough. Most good builders will want to clear the snagging list quickly so they can collect their final payment and move on to their next job.

Who signs off the building regulations completion certificate?

Building regulations approval comes from council building control or a registered building control approver. They will inspect the structural and safety elements of the build, which is an entirely separate process from your cosmetic snagging list. You will need this completion certificate when selling your home.

Do I need planning permission for my extension?

Planning permission and building regulations are two separate systems and many projects need one, both or neither. Many extensions and loft conversions on houses fall under permitted development, within set limits on size, height and position, but flats and maisonettes do not have these rights. In England the householder application fee is £548 from 1 April 2026, most applications are decided within 8 weeks, and work must start within three years of permission being granted, or five years in Wales. Scotland and Northern Ireland have their own systems, so you must always check locally.

Do I check the gas and electrics myself during the walkthrough?

You should visually check that sockets and switches work and that radiators heat up, but you must never touch the wiring or inspect gas fittings yourself. Always use a Gas Safe registered engineer for gas work and a registered electrician for electrical work. Houses built or refurbished before 2000 may also contain asbestos, which must be dealt with by competent people.

Your next steps

To manage your snagging list and final payment safely, follow these steps before the builder leaves the site:

  • Check your contract to confirm the rules for your final payment and any agreed retention
  • Arrange a joint walkthrough with your builder in daylight
  • Take your drawings, specification and schedule of works to check off the finished rooms
  • Write down every snag you agree on and share the final list with the builder
  • Collect your building control completion certificate, Competent Person Scheme certificates and warranties
  • Hold back the final payment only if your contract allows it, and pay the balance once the snags are fixed

Getting the snagging right is the final hurdle in a long project, and a clear list helps both you and the builder part on good terms. If you are just starting to plan a new extension or renovation and want to get your quotes and contracts set up properly from day one, you can find a builder near you to discuss your ideas.

Find a top rated builder near you

3,554 builders across the UK, each ranked on their Google rating and the number of reviews behind it. Start with your county:

All counties and towns · The UK Top 100 builders

Gareth Pritchard
Written by
Gareth Pritchard Researcher

Gareth writes for Top Rated Builders, with a focus on helping homeowners compare quotes and ask the right questions. Away from the desk, he follows county cricket through thick and thin.