What to Do If Your Builder Walks Off the Job or Goes Bust

What to do if your builder stops turning up or goes bust: check what happened, protect your home, use card and guarantee protection, register as a creditor and find someone to finish.

Illustration of a half-built brick extension left unfinished with scaffolding and a wheelbarrow

If your builder has walked off the job, do not panic. First, find out whether the builder has simply stopped turning up or if their business has failed. Keep detailed records of the site and check how you paid, because credit card payments can be protected under consumer law.

Find out what has happened first

A quiet building site does not always mean the builder has vanished for good. Delays happen due to poor weather, material shortages or personal emergencies. You need to establish the facts before you take action.

To establish the facts, you should take these steps:

  • Contact your general builder or main contractor to ask for a clear explanation.
  • Wait a few days for a response to allow for personal emergencies.
  • Keep a written record of every call, text and email you send.
  • Check the site to see if subcontractors and tools have also been removed.

The main contractor is the person running the site, and they usually hire subcontractors to handle specific trades like plumbing and plastering. If the main contractor has abandoned the project, the subcontractors may leave too. A builder who is ignoring your calls might be taking on too many jobs, which is a common mistake made by cowboy builders who cannot staff their sites properly. A business that has gone bust is a different legal situation, and knowing which scenario you face dictates your next steps.

What to do if the builder stops turning up

When a builder is still trading but work has stopped, the Consumer Rights Act 2015 applies. This law says work must be done with reasonable care and skill, for a reasonable price, and within a reasonable time where no date was agreed. Citizens Advice states that you usually have to give the trader a second chance to finish the job, unless you made it clear from the start that the original deadline was essential. You must put the new deadline in writing.

If the original date was essential and they missed it, you can tell the trader in writing to stop. You should generally pay for the work completed so far, though you can ask for a discount. If they have done little or nothing, you may not need to pay at all. If you have paid a deposit that is more than the work is worth, suggest a figure and ask for the difference back.

Cancelling is not breaking the agreement if the business does not honour its contractual obligations, such as not doing the work within a reasonable time and missing a final deadline you set. Try to negotiate first, check whether a trade association can help, then consider an alternative dispute resolution scheme. The Citizens Advice consumer helpline is 0808 223 1133.

What to do if the business goes bust

If you suspect the company has failed, you must check their official status. For limited companies, check Companies House, and for sole traders or partnerships, check the Insolvency Register. It can take a few weeks for information to appear on these registers after a firm collapses.

When a limited company stops trading, you cannot go to court. Instead, you need to find the administrator or receiver who is dealing with settling the trader's debts. If another company has bought the business, explain the situation to the new owners to see if they will honour the contract. You can also use any existing guarantee or warranty if the completed work is unsatisfactory.

Check how you paid for card protection

Your payment method heavily influences your chances of getting money back. Under Section 75, you can make a claim if you paid more than 100 pounds and no more than 30,000 pounds. This limit applies to one item, and it covers credit cards and buy now, pay later purchases, but not debit cards. If you paid part of the cost by credit card, you can claim the full item cost provided the total falls between 100 pounds and 30,000 pounds.

For debit cards or charge cards, chargeback applies and only for the amount paid on that card. You can ask your bank for a chargeback, but the bank might not agree to do it. Always tell your card provider in writing about the dispute. You also have a 14-day cooling-off period to cancel for contracts agreed at home, by phone or online.

Check for an insurance-backed guarantee

A builder's own warranty may be unenforceable if they have stopped trading or retired. An insurance-backed guarantee provides much stronger protection for your property. For example, the FMB Building Work Guarantee covers the cost to fix structural defects such as cracks and water ingress that appear after the work is finished. This protection lasts up to a decade after the building work finishes.

Your builder may include this guarantee in their quote, or you can buy it yourself through FMB Insurance. To rely on this warranty, you must submit confirmation of any deposit paid within 28 days. You should always keep a written record of any deposit you hand over. If you used a Federation of Master Builders member and they are still trading, raise concerns with your main point of contact as soon as possible, as the FMB may help members' customers through its free dispute resolution service.

How to register as a creditor

If the builder's business is officially insolvent, you should always register a claim as a creditor on the GOV.UK website. You need to contact the person handling the case, who can be found on the Individual Insolvency Register for personal bankruptcy or Companies House for company liquidation. The specific form you use depends on exactly how much money you are owed.

If you are owed more than 1,000 pounds, you must submit a Proof of Debt form. If the amount is 1,000 pounds or less, simply give the case handler your contact details and state the amount. Once registered, you are kept informed of progress and can vote at creditors' meetings.

You are not guaranteed any payment when a business fails. Other people, like banks, will get paid first so you might not get any money back. The rules also differ depending on where you live in the UK. Scotland works differently and handles these cases through the Accountant in Bankruptcy, while Northern Ireland has its own systems, so check locally.

Make the site safe and keep records

An abandoned building site is a serious hazard. Under the CDM Regulations 2015, a domestic client's health and safety duties normally pass to the builder. If the builder walks off, secure the site as far as it is safe to do so. Report dangerous buildings to your local council immediately, and if you smell gas, call the National Gas Emergency Service on 0800 111 999, or 0800 002 001 in Northern Ireland.

Never attempt structural, electrical, gas or temporary works yourself. Gas work needs a Gas Safe registered engineer and electrical work requires a registered electrician. Houses built or refurbished before 2000 may contain asbestos, which must be dealt with by competent people. A new qualified builder or structural engineer should assess the site safely.

While securing the site, gather your evidence. Keep a written record of everything, including dates and copies of all paperwork. Take clear photographs of the unfinished work from multiple angles. This evidence is vital if you need to complain about a builder or make a financial claim.

Find a new builder to finish the job

A new builder will need to see your original drawings, the specification and the schedule of works. A specification is a detailed document listing the exact materials required, while a schedule of works breaks the job down into step-by-step tasks. If the work involved removing walls, the new builder will also need to review your structural engineer's calculations.

The immediate priority for the new team is making the building weathertight to prevent rain damage. After that, they will assess the progress of the first fix and second fix. First fix involves structural work, hidden pipes and cables installed before plastering, while second fix covers connecting the fixtures and fittings after the plastering is dry.

You must also check the status of your permissions. Planning permission and building regulations are two separate systems and many projects need one, both or neither. Building regulations approval is needed for extensions, loft conversions and most structural and services work. It comes from council building control or a registered building control approver, or through a competent person scheme for certain trades.

The building control completion certificate matters when selling, and councils can now take enforcement action for up to ten years for non-compliance. If you are building an extension or loft conversion, check your planning status. Many fall under permitted development, within set limits on size, height and position. Flats and maisonettes do not have these rights, and conservation areas, listed buildings and properties with planning conditions are more restricted.

Larger single-storey rear extensions can go through prior approval. In England the householder application fee is 548 pounds from 1 April 2026, most applications are decided within 8 weeks, and work must start within three years of permission being granted, or five in Wales. Once the main work is done, the new builder will handle the snagging, which means fixing minor faults before you make the final payment.

How to reduce the risk next time

Many disputes begin with bad paperwork and unclear costs. Choosing a builder on price alone is a common mistake that often leads to problems. You should never start a project without drawings, a clear specification and a written contract. Make sure you understand the difference between documents, as a quote is fixed and an estimate is not.

Builders price from drawings and a specification, not from a cost per square metre. Per square metre figures are only a way to set an early budget, and figures differ widely because some cover a basic shell and others a finished room. A proper build quote normally excludes the following costs:

  • Kitchens and bathrooms.
  • Flooring and decoration.
  • Professional fees for architects or engineers.
  • Planning and building control fees.
  • Party wall costs.
  • VAT at 20 per cent.

London and the South East cost more, and labour is a large share of any job. Never pay the whole cost of the work upfront, and avoid large cash deposits. Beware of cash deals offered without VAT or paperwork. Instead, agree on stage payments tied to progress, and keep a final payment back until completion and snagging are done.

There is a separate guide on how much to pay a builder upfront. Your contract should include a contingency, which is a reserve fund for unexpected problems. It might also include provisional sums, which are allowances for things that cannot be priced yet. Any changes to the design mid-build are called variations, and changing the design mid-build without agreeing the cost in writing is a fast way to lose control of your budget.

Always tell your home insurer about the building work before it starts. Look for builders vetted by recognized bodies to improve your chances of a smooth project. The Federation of Master Builders vets and independently inspects members. TrustMark is the government-endorsed quality scheme, and you should treat membership on the scheme's own register as a good sign, not a guarantee.

Common questions

Do I need a new planning application?

Work must start within three years of planning permission being granted in England, or five in Wales. Confirm with your local council what applies to your project. If your project is permitted development, a lawful development certificate gives written proof of that.

Can I withhold payment if the builder walks off?

If an essential deadline was missed and you told the builder in writing to stop, you should generally pay for the work completed so far, though you can ask for a discount. If they have done little or nothing, you may not need to pay at all. If you have paid a deposit that is more than the work is worth, suggest a figure and ask for the difference back.

What happens to my party wall agreement?

The Party Wall etc. Act 1996 applies in England and Wales to work on or near a shared wall or boundary. Party wall agreements are separate from planning permission and building regulations approval. If the builder walks off, tell your neighbour and check what your agreement says before work restarts.

Can I hire an electrician to finish the wiring?

Electrical work needs a registered electrician, and gas work needs a Gas Safe registered engineer. Do not try to finish dangerous work yourself. You should hire a qualified tradesperson to assess what the previous builder left behind, and confirm their membership on the scheme's own register.

What if I was told building regulations were not needed?

Being told building regulations are not needed is a common mistake and sometimes a scam. Building regulations approval is required for most structural and services work. Ask council building control what is needed for the unfinished work before anyone carries on.

Next steps to take

If your builder has abandoned the job, follow these steps to protect your property and your money:

  • Try to contact the builder to find out if they are delayed or if the business has closed.
  • Check Companies House or the Insolvency Register to confirm if the firm is officially insolvent.
  • Secure the site immediately and report any dangerous structures to the local council.
  • Take clear photographs of all unfinished work and gather your contracts, invoices and receipts.
  • Contact your credit card provider in writing to start a Section 75 claim if you paid by credit card.
  • Register as a creditor on the GOV.UK website if the company has gone into liquidation.
  • Call the Citizens Advice consumer helpline on 0808 223 1133 for guidance on your specific contract.

Dealing with an unfinished project is incredibly stressful, but taking methodical steps will help you regain control. Citizens Advice is the signpost if you are unsure of your position before ending a contract. Once the site is safe and your position is clear, you can find a builder near you and compare their reviews.

Find a top rated builder near you

3,554 builders across the UK, each ranked on their Google rating and the number of reviews behind it. Start with your county:

All counties and towns · The UK Top 100 builders

Daniel Hughes
Written by
Daniel Hughes Editor

Daniel is a writer and editor for Top Rated Builders, covering extensions, renovations and building work. When he's not writing guides, he spends weekends walking in the Peak District.

Looking for a trusted builder? Browse our verified listings.

Find a Builder