Typical published figures for 2026 put the average cost of a double-storey extension at £60,000, with a typical range from £30,000 to £90,000. Separate published figures based on a good finish put the average at £82,500, with a typical total sitting between £80,000 and £120,000. These averages differ because published figures depend heavily on what is included, with some covering a basic shell and others pricing a fully finished space.
Typical double-storey extension costs in 2026
When you approach a general builder or main contractor, they do not quote a flat cost per square metre. They price the job from your drawings, a detailed specification and a schedule of works. A schedule of works is a comprehensive list of every task required to complete the build in the right order. The specification details the exact materials to be used, from the type of facing brick to the brand of insulation.
The main contractor uses these documents to calculate the cost of their own labour, the materials, and the specialist subcontractors they bring in. Subcontractors are tradespeople hired for specific parts of the job, such as roofers, bricklayers and plasterers. Cost per square metre figures are only a way to set an early budget before you have your drawings ready.
Cost by size and specification
To understand what a fair price looks like, it helps to look at typical published prices based on the floor area and the quality of the finish. The table below shows how the cost scales based on the size of the extension and whether you choose a basic, average or high specification.
|
Size of extension |
Basic finish |
Average finish |
High finish |
|---|---|---|---|
|
20 square metres |
£32,000 |
£35,000 |
£38,000 |
|
40 square metres |
£52,000 |
£56,000 |
£60,000 |
|
70 square metres |
£75,000 |
£82,000 |
£90,000 |
These are typical published prices for 2026, but your real quotes will depend on your specific design, local ground conditions and the final finish you choose.
The cost per square metre of an extension often drops as the footprint gets larger. For an extension up to 20 square metres, typical published figures put the basic building materials and construction cost at £1,600 to £1,900 per square metre. For an extension over 20 square metres, the cost falls to £1,300 to £1,500 per square metre. Separate published figures give a range of £950 to £1,500 per square metre for a basic finish, £1,500 to £1,850 for a good finish, and £1,850 to £2,200 for a high finish.
Two terms help when you read a specification. First fix is the hidden work, such as running pipes and wiring before the plastering begins. Second fix covers the visible items, such as fitting sockets, connecting lights, hanging internal doors and fitting skirting boards. A higher specification usually means dearer fittings and finishes, which is why the table has three columns.
Cost by type of double-storey extension
The position of your extension and how it connects to the existing house will also change the price. Building a simple square box at the rear of the house is normally more straightforward than wrapping a complex extension around the side and back.
Typical published prices give the following ranges for different types of double-storey extension:
- Side return extension: £30,000 to £40,000
- Side extension: £35,000 to £45,000
- Rear extension: £40,000 to £50,000
- Flat roof extension: £45,000 to £55,000
- Front extension: £45,000 to £60,000
- Wrap-around extension: £70,000 to £90,000
These are published ranges for each type, and your quotes will depend on your drawings and specification.
The final price you pay will depend heavily on access to your site. Access to your site can affect the price. Labour is a large share of any building job, and London and the South East cost more.
Double-storey compared with single-storey
Many homeowners weigh up going up as well as out to make the most of their space without losing too much garden. A second storey shares the foundations and ground floor walls with the space below it.
Per square metre figures are given for both kinds of extension, so you can compare the figures above with those in our guide to house extension cost per square metre to see how they differ.
A two-storey extension usually needs a structural engineer to check the foundations, and to provide calculations for the design. Confirm what your project needs with the council and building control. You can read more about this in our guide on when you need a structural engineer.
What the price may not include
A builder's quote covers the structure and the specific materials listed in your schedule of works. It rarely covers the total cost of the whole project from start to finish. You must allow for several extra costs when setting your budget to avoid running out of money before the end.
Typical published figures state that the following items are usually outside a standard build quote:
- Kitchen and bathroom fit-outs
- Clearing existing structures, utilities or trees
- Soil-related foundation costs
- Temporary accommodation if you move out during the build
- Skip hire for waste removal
- Professional fees for architects and engineers
- Planning and building control fees
- A contingency fund for unexpected ground conditions
If you are adding a kitchen or bathroom to the new space, you need to budget for the units, tiles and fitting separately. Typical published prices for a kitchen add-on are £8,000 to £15,000 depending on the specification. A bathroom add-on typically costs £4,500 to £9,000. VAT at 20 per cent is normally added to building work, so check whether each quote includes it.
Your builder might include provisional sums in their quote. Provisional sums are allowances for things that cannot be priced accurately yet, such as the exact depth of the foundations before the digging starts. You must also hold back a contingency budget. A contingency is a pot of money you keep in reserve to cover unexpected problems or variations. Variations are changes you make to the design or materials after the price is agreed.
How long a double-storey extension takes
The time it takes to build a two-storey extension depends on its size, the complexity of the roof and the weather. Typical published timelines show the build takes up to 14 weeks overall. This breaks down by size as 6 to 8 weeks for a 20 square metre extension, 9 to 11 weeks for 40 square metres, and 12 to 14 weeks for 70 square metres.
Other 2026 figures say most extension jobs take between 10 and 18 weeks, with a labour duration of 16 to 18 weeks for a lean-to double-storey extension and 17 to 19 weeks for a wrap-around. These are longer than the figures above, so treat build times as a rough guide and ask each builder for a programme.
These timelines only cover the building work itself. Planning, architect work or agreeing a party wall must be completed before building starts, which adds significant time to the overall timeline. A good builder will agree stage payments with you before they start. Stage payments are instalments paid at set points during the build, such as when the foundations are poured or the roof is tiled.
You should always hold back a final payment on completion. This final payment is released only after snagging is finished. Snagging is the process of finding and fixing minor faults, such as a scratched window frame or a loose skirting board, before you sign off the job.
Planning permission and permitted development
Double-storey projects will almost always need householder planning permission. However, some two-storey extensions fall under permitted development rights, which allow you to build without a full planning application if you meet strict limits on size, height and position.
For extensions of more than one-storey, the Planning Portal states that the work must not extend beyond the rear wall of the original house by more than three metres. It must not be within seven metres of any boundary opposite the rear wall, and the roof pitch must match the existing house as far as practicable.
These permitted development rights apply to houses only, so flats and maisonettes do not have them. If your home is on Article 2(3) designated land, such as a conservation area, all rear extensions of more than one-storey require householder planning permission. Listed buildings and properties with planning conditions are also more restricted.
If you do use permitted development rights, you can apply for a lawful development certificate from the council. This gives you written proof that the project is permitted development. You can read more about the rules in our guide on whether you need planning permission for an extension.
If you need to apply for planning permission, the householder application fee in England is £548 from 1 April 2026. The fee is £585 in Wales and £371 in Scotland. Most planning applications are decided within 8 weeks. Once permission is granted, work must start within three years in England, or five years in Wales.
Building regulations and party walls
Planning permission is about how the building looks and impacts the neighbourhood. The Building Regulations 2010 cover the construction and extension of buildings to ensure they are safe, warm and structurally sound. GOV.UK confirms that building regulations approval is different from planning permission, so you might need both. Building regulations approval is needed for extensions, loft conversions and most structural and services work.
You must get building regulations approval from your council building control team or a registered building control approver. They will inspect the work at key stages. When the work is finished, they will issue a completion certificate. This completion certificate matters when selling your home, and councils can now take enforcement action for up to ten years if building work does not meet the regulations.
Certain trades can self-certify their work through a competent person scheme. Gas work needs a Gas Safe registered engineer, and electrical work needs a registered electrician. Always confirm their membership on the scheme's own register. Treat membership of trade bodies such as the Federation of Master Builders or the government-endorsed TrustMark scheme as a good sign, not a guarantee. The Federation of Master Builders vets and independently inspects its members.
If you are building on or near a shared wall or boundary, the Party Wall etc. Act 1996 applies in England and Wales. You may need to notify your neighbours in writing before work begins. Under the CDM Regulations 2015, a domestic client's health and safety duties normally pass to the builder. If your house was built or refurbished before 2000, it may contain asbestos, which must be dealt with by competent people. Scotland and Northern Ireland have their own systems for building standards and boundaries, so check locally.
Common mistakes to avoid when hiring a builder
Choosing a builder on price alone is a common trap. If one quote is much cheaper than the others, ask what has been left out. Another mistake is starting work without drawings, a detailed specification or a written contract. Without these, you have nothing to hold the builder to if the work is poor or the price changes.
You should never accept an estimate as if it were a quote. An estimate is an educated guess, while a quote is a fixed price. Changing the design mid-build without agreeing the cost in writing is a common way for the budget to run away. Cowboy builders often take on more jobs than they can staff, which drags the job out and leaves your home a building site for months.
Cowboy builders may also ask for large cash deposits or offer cash deals without VAT or paperwork. This leaves you with little paperwork to rely on. Always tell your home insurer about the project before any work begins, because structural work needs to be declared to your insurer. Never pay the final instalment before snagging and certificates are done, and be highly suspicious of any builder who tells you building regulations are not needed.
Common questions
What rights do I have if the building work is poor?
Under the Consumer Rights Act 2015, building work must be carried out with reasonable care and skill. It must also be completed for a reasonable price and within a reasonable time where no specific terms were agreed. If you have a dispute with your builder, Citizens Advice is the best signpost for guidance on your consumer rights.
Do I get a cooling-off period for building work?
If you agree a contract with a builder at your home, by phone or online, you have a 14-day cooling-off period. Ask the builder to explain how it works, as conditions can apply. Paying by credit card can also give you Section 75 protection, which has limits on the price of the item.
Can I build a double-storey extension without planning permission?
Many extensions fall under permitted development, but double-storey projects will almost always need householder planning permission because of the strict rules on height and boundaries. You must confirm the rules with your council, especially if you live in a flat, a maisonette, a conservation area or a listed building.
Why do I need a contingency budget?
A contingency is a reserve fund to cover unexpected problems, such as discovering poor ground conditions when digging the foundations. It also covers variations, which are changes you make to the design or materials after the main price is agreed and the work has started.
Budget and quote checklist
Before you hire a builder for your double-storey extension, make sure you have everything in place to protect your budget and your property.
- Get full architectural drawings and a specification before asking for prices.
- Ask for three written quotes against the same drawings so you can compare them fairly.
- Ask to visit finished jobs and demand to see proof of the firm's insurance.
- Agree a written contract with stage payments tied to physical progress, not dates.
- Keep a contingency fund for unexpected ground conditions or structural changes.
- Never pay the final instalment before all snagging is finished and you have your completion certificates.
A double-storey extension is a major investment, but taking the time to plan the details will keep your budget on track. When you have your drawings ready and your permissions confirmed, you can find a builder near you to start pricing the work.