Part H is the part of the Building Regulations 2010 for drainage and waste disposal. Its Approved Document gives guidance for building work in England, and the 2015 edition has been valid since 1 October 2015. When you plan an extension, the drainage work is covered by Part H. The document deals with how foul water, rainwater and solid waste storage are provided for, and this guide explains what it covers.
What Part H of the building regulations is
Planning permission and building regulations are two separate systems. Approved Document H deals with drainage and waste disposal. Our guide to building regulations for home improvements covers the wider process.
An Approved Document is guidance on one way of meeting the regulations. Approved Document H (Drainage and waste disposal), 2015 edition, was published in March 2015 and is valid from 1 October 2015. You can view the document on the Planning Portal.
The 2002 edition of Approved Document H, as amended, continues to apply to work started before 1 October 2015. It also applies to work subject to a building notice, full plans application or initial notice submitted before that date.
You should confirm with your local authority or approved inspector which permissions and approvals your specific project needs, because the answer depends on your particular project.
Which edition applies and where
Approved Document H gives guidance for building work carried out in England. It also applies to building work on excepted energy buildings in Wales as defined in the Welsh Ministers (Transfer of Functions) (No 2) Order 2009. The main 2015 changes were extra guidance on solid waste storage in H6 and a consequential amendment to the limits of application of H3. The official guidance is published by the government as Approved Document H.
Scotland and Northern Ireland have their own systems for building standards, and in Wales this document applies to the excepted energy buildings described above. If you live in Scotland, Wales or Northern Ireland, check the rules that apply with your local authority. A general builder or main contractor runs the whole job and brings in subcontractors such as groundworkers and drainage specialists.
What the six parts of Part H cover
The approved document covers six specific requirements for home drainage and waste. Your designer should cover these in your drawings, which are the architectural plans showing what will be built. They should also appear in your specification, the detailed written document listing exact materials and methods for the builder to follow.
The six requirements are:
- H1 Foul water drainage
- H2 Wastewater treatment systems and cesspools
- H3 Rainwater drainage
- H4 Building over sewers
- H5 Separate systems of drainage
- H6 Solid waste storage
Having these details clearly specified stops the builder having to guess. Builders price from drawings and a specification, not from a cost per square metre. Per square metre figures are only a way to set an early budget, and published figures differ widely because some cover a basic shell and others a finished room.
Foul water drainage and where it must connect
Requirement H1 states that an adequate system of drainage must carry foul water from appliances. Foul water includes the wastewater from your toilets, showers, baths, washing machines and kitchen sinks. The regulations set a strict order of priority for where this foul water must go. You cannot simply choose the cheapest option.
This table shows the order of priority for foul water drainage connections.
|
Priority level |
Drainage connection type |
|---|---|
|
First priority |
A public sewer |
|
Second priority |
A private sewer communicating with a public sewer |
|
Third priority |
A septic tank with an appropriate form of secondary treatment or another wastewater treatment system |
|
Fourth priority |
A cesspool |
Each step down the list applies where the one above it is not reasonably practicable, as the requirement states.
Guidance H1 2.3 states that foul drainage should be connected to a public foul or combined sewer wherever this is reasonably practicable. For small developments, a connection should be made to a public sewer where this is within 30m, provided the developer has the right to construct the drainage over any intervening private land.
Under Guidance H1 2.5, the sewerage undertaker should be notified at least three weeks before it is intended to connect to the public sewer. Your builder should build this notice period into their schedule of works, which is the timeline showing when each task happens.
If your extension includes a basement containing sanitary appliances, Guidance H1 2.9 applies. Where the sewerage undertaker considers the risk of flooding due to surcharge of the sewer to be high, the drainage from the basement should be pumped. Where the risk is low, an anti-flooding valve should be installed.
Rainwater and soakaways
Requirement H3 says rainwater from a roof drainage system must discharge to one of three places, in order of priority.
This table shows the order of priority for rainwater drainage connections.
|
Priority level |
Drainage connection type |
|---|---|
|
First priority |
An adequate soakaway or some other adequate infiltration system |
|
Second priority |
A watercourse |
|
Third priority |
A sewer |
Each step down applies where the one above it is not reasonably practicable.
Guidance H3 says the requirement will be met if rainwater soaking into the ground is distributed sufficiently so that it does not damage the foundations of the proposed building or any adjacent structure. Ask your designer to explain how the drainage design protects the foundations of your extension and of neighbouring structures.
Guidance H3 3.25 makes clear that infiltration drainage is not always possible. Infiltration devices should not be built within 5m of a building or road. They must also not be built in areas of unstable land, in ground where the water table reaches the bottom of the device at any time of the year, or where contamination in the runoff could pollute groundwater.
Sorting this out early prevents variations, which are changes made to the design or scope after the price is agreed. Changes mid-build can push up the final cost.
Building over or near drains and sewers
Requirement H4 applies to the erection or extension of a building, or work involving underpinning, over a drain, sewer or disposal main shown on any map of sewers. The provisions apply to construction, extension or underpinning over or within 3m of the centreline of an existing drain, sewer or disposal main shown on the sewerage undertaker's sewer records, whether a public sewer or not.
Guidance H4 1.5 and 1.6 state that the length of drain or sewer under a building should not exceed 6m except with the permission of its owners. For a public sewer, the owner is the sewerage undertaker. Buildings or extensions should not be built over or within 3m of any drain or sewer more than 3m deep or greater than 225mm in diameter except with the permission of the owners.
Ground conditions matter. Guidance H4 1.1 states that in easily eroded soils (fine sands, fine silty sands, saturated silts and peat) buildings should not be constructed over or within 3m of drains or sewers unless special measures are taken. Special measures will not be needed if the invert of the drain or sewer is above the foundation level, above the groundwater level and no more than 1m deep.
Under Guidance H4 1.4, a satisfactory diversionary route should be available so the drain or sewer could be reconstructed without affecting the building. This route should not pass within 3m of the building.
When your builder digs the trenches, Guidance H1 2.25 applies. A drain trench should not be excavated lower than the foundations of any building nearby unless, where the trench is within 1m of the foundation, it is filled with concrete up to the lowest level of the foundation.
Drainage work, including any trench work, is for a competent drainage contractor or builder, not a job to do yourself.
If your drainage trench is near a neighbour's boundary, the Party Wall etc. Act 1996 applies in England and Wales to work on or near a shared wall or boundary. Ask your designer or builder whether the Act applies to your work.
Who owns the drain and what the water company does
Guidance H4 0.2 to 0.4 explains that copies of the sewer record maps are held by the sewerage undertaker and by local authorities. The sewerage undertaker is the water company that owns the public sewers.
Where building over or near a drain or sewer on a map of sewers, the developer should consult its owner. For a public sewer, the undertaker may be able to advise on its condition or arrange an inspection. Repair or replacement of a public sewer is carried out by the sewerage undertaker.
The Water UK homeowner guide explains that if you build over, or within three metres of, a water company's sewer pipes, you may need consent from the water company that collects your wastewater. The Water UK guide explains that sewers carry wastewater from two or more houses. Lateral drains carry wastewater from a single house and meet the public sewer network outside its boundary.
Planning permission, building regulations approval or permitted development rights give no automatic consent to build over or close to its sewers. If a project does not meet the water companies' conditions, it is normally dealt with by a formal build-over agreement between the homeowner and the water company. You can read more about build over agreements to see how this impacts your timeline.
If the exact location of a sewer is unknown when you ask for quotes, a builder might include provisional sums. These are allowances in the quote for things that cannot be priced accurately yet. You should also hold a contingency, which is your own reserve fund for unexpected costs.
Repairs and alterations to existing drains
Appendix H1-B of the approved document covers repairs, reconstruction or minor alterations to drains or sewers. These are not normally covered by the Building Regulations, but local authorities have other powers to control them. Material alterations to existing drains and sewers are covered by the building regulations.
Under section 61 of the Building Act 1984, anyone intending to repair, reconstruct or alter a drain must give 24 hours notice to the local authority. The only exception to this notice period is in an emergency.
Houses built or refurbished before 2000 may contain asbestos, which must be dealt with by competent people. Do not disturb suspect materials yourself.
You should agree stage payments with your builder. This means paying the builder in agreed instalments as work progresses, such as when the drainage is signed off. The final payment is the last instalment paid on completion, and you should only pay it after snagging. Snagging is checking for minor faults and unfinished details at the end of the project.
Consumer protection and hiring a builder
When hiring a builder for drainage work, check their credentials. The Federation of Master Builders vets and independently inspects members. TrustMark is the government-endorsed quality scheme. Gas work needs a Gas Safe registered engineer and electrical work a registered electrician. Confirm membership on the scheme's own register and treat it as a good sign, not a guarantee.
Under the Consumer Rights Act 2015, any work must be done with reasonable care and skill, for a reasonable price and within a reasonable time where none was agreed. A quote is fixed and an estimate is not. If you agree a contract at home, by phone or online, you have a 14-day cooling-off period. You get Section 75 protection on credit card payments, which can be useful when paying deposits. If a dispute arises over drainage work, Citizens Advice is the signpost for disputes.
Under the CDM Regulations 2015, a domestic client's health and safety duties normally pass to the builder.
Make clear what is normally outside a build quote: kitchens and bathrooms, flooring and decoration, professional fees, planning and building control fees, party wall costs and VAT at 20 per cent. London and the South East cost more. Labour is a large share of any job.
Common mistakes in this trade include choosing on price alone, starting without drawings, a specification or a written contract, and handing over large cash deposits. Accepting an estimate as if it were a quote is dangerous. Changing the design mid-build without agreeing the cost in writing causes disputes. Being told building regulations are not needed is a red flag. Avoid cash deals offered without VAT or paperwork, and not telling the home insurer is another common mistake. Never pay the final instalment before snagging and certificates are done. Watch out for cowboy builders who take on more jobs than they can staff.
Common questions
What is the difference between a sewer and a lateral drain?
The difference is the number of houses served. A sewer serves two or more houses, while a lateral drain serves only one and meets the public sewer network outside the boundary of that house.
Does planning permission cover building over a sewer?
No. None of those permissions gives automatic consent to build over or close to a water company's sewers, so contact the water company that collects your wastewater early.
Can I put a soakaway right next to my extension?
The guidance sets a 5m distance from a building or road for infiltration devices, so a soakaway close to an extension is a question for your designer. Siting and design are matters for a competent professional, not something to do yourself.
What happens if my new basement has a toilet?
The guidance depends on how the sewerage undertaker rates the flood risk from the sewer. High risk points to pumped drainage and low risk to an anti-flooding valve, so ask your designer to confirm what applies.
How long is the drain pipe allowed to run under my building?
The guidance sets a limit of 6m for drain or sewer length under a building, and longer runs need the owners' permission. For a public sewer, that means the sewerage undertaker.
What to do next
Before you sign a contract or pay a deposit, take these steps to ensure your drainage plans comply with Part H:
- Find out what drains lie under your plot early by checking the sewer records held by the sewerage undertaker and your local authority.
- Contact the water company that collects your wastewater to discuss your plans and find out if you need a formal build-over agreement.
- Ask your designer and builder how the design meets Part H, specifically regarding the order of priority for foul water and rainwater.
- Get a written quote based on detailed drawings and a specification, not an estimate. You can read how to compare builder quotes to spot what is missing.
- Ensure your contract includes stage payments tied to progress and a final payment only after snagging and certificates are done.
- Allow a contingency fund for unexpected ground conditions or drainage diversions.
Drainage work is for a competent drainage contractor or builder, and getting it right is vital for the safety of your home. When you have your drawings and specification ready, you can find a builder near you to provide a detailed written quote.