How Much Does a Planning Application Cost?

What a planning application costs in England in 2026: the council fee, other application fees, the online service charge, and the drawings, reports and building control costs that come with it.

A calculator, coins, rolled drawings and a house model on a desk.

In England the fee for a typical householder application is £548, while in Wales the cost is £585. These fees are set by the government and checked by your local council, but you will also face other costs before any building starts. This guide breaks down the planning application fees and the other professional charges you need to budget for.

The council fee for a typical householder application

Most homeowners planning an extension or a loft conversion will submit a householder application. In England, for a typical householder application the cost is £548. In Wales the cost of a typical householder application is £585. The fee depends on the type and scale of the development, and the local planning authority confirms the amount payable when you submit.

Planning permission and building regulations are two separate systems. Many projects need one, both or neither. Planning permission deals with the look of the building and its impact on the local area. Building regulations approval ensures the structure is safe and energy efficient.

Many extensions and loft conversions on houses fall under permitted development, within set limits on size, height and position. Flats and maisonettes do not have these rights. Conservation areas, listed buildings and properties with planning conditions are also more restricted. If your project falls outside permitted development rights, you must apply for full planning permission and pay the council fee.

Other application fees in 2026

The exact fee you pay will depend on what you are building. The council page notes that these fees were being brought in by legislation. The table below shows the council fee schedule effective from 1 April 2026 for different types of application.

Type of application

Fee from 1 April 2026

Enlargement, improvement or alteration of a single dwelling

£548

Small-scale works within a dwelling's curtilage

£272

Enlargement, improvement or alteration of two or more dwellings

£1,083

Prior approvals not involving building operations

£249

Prior approvals involving building operations

£536

Change of Class E use to residential under Class MA

£260 per dwelling house

Discharge of conditions (householder)

£89

Discharge of conditions (any other development)

£309

The figures above come from one council's fee schedule effective from 1 April 2026. The local planning authority confirms the amount payable when you submit, so always confirm the exact amount on the Planning Portal calculator.

The Planning Portal service charge

When you apply online, you will usually pay a service charge on top of the council fee. The service charge applies to planning applications that attract a fee of over £100, payable at submission.

There are three bands for this charge. Band 0 is £0. Band 1 is £99 including VAT for less complex application types. Band 2 is £149 including VAT for more complex ones. Most applications are free or Band 1.

Which band applies depends on the type of application, so check the total on the Planning Portal before you submit.

Fees that are not charged

You do not have to pay an application fee for every type of consent. For some types of consent, for example listed buildings, no application fee is required.

Larger single-storey rear extensions can go through prior approval rather than a full householder application. This involves a different fee structure, as shown in the table above. You must check with your council which route suits your project.

Drawings, plans and professional fees

The council fee is only one part of getting permission. You will also need detailed drawings and a specification. Builders price from drawings and a specification, not from a cost per square metre. Per square metre figures are only a way to set an early budget, and figures differ widely because some cover a basic shell and others a finished room.

To get these drawings, you will usually hire a professional. You can expect to pay an architect 8 to 15 per cent of the total build cost. They will draw up the existing layout and the proposed changes, which you need for the application. You can read more about architect fees for an extension to understand how they structure their charges.

Pre-application advice and drawings are quoted separately by councils and professionals. You should always get three written quotes against the same drawings to ensure you are getting a fair price. A clear schedule of works will help builders understand exactly what they are quoting for.

You might also need to apply for a lawful development certificate. A lawful development certificate gives written proof that a project is permitted development.

Other costs before building starts

Before your general builder or main contractor brings in their subcontractors, you will have to pay for other professional services. A structural engineer will provide calculations to prove the new building will stand up. A structural engineer costs £400 to £2,000.

Building regulations approval is needed for extensions, loft conversions and most structural and services work. It comes from council building control or a registered building control approver. Local authority building control bodies set their own fees. Building control costs £250 to £550 for Full Plans or £450 to £900 for a Building Notice.

The Party Wall etc. Act 1996 applies in England and Wales to work on or near a shared wall or boundary. A Party Wall Agreement costs £700 to £2,000, but it is free if the neighbour consents in writing. You may also need a house survey, which costs £600 to £1,400. The table below shows these typical professional costs.

Professional service

Typical cost in 2026

Architect

8 to 15 per cent of total cost

Structural engineer

£400 to £2,000

Building Control (Full Plans)

£250 to £550

Building Control (Building Notice)

£450 to £900

Party Wall Agreement

£700 to £2,000

House survey

£600 to £1,400

The figures above are typical 2026 prices. These are professional fees, not building costs, and real quotes depend on design, ground conditions, access and finish.

What happens to the fee if the application fails

Sometimes an application is refused, or you decide to stop the project before a decision is made. The application fee will generally not be refundable if the application is withdrawn or not determined.

In the past, you could often submit a revised application for free if your first one was refused. The right to a free go was removed by the 2023 fees amendment regulations. The transition period expired on 5 December 2024.

This means a resubmission after a refusal now normally carries a fee. You must budget carefully and ensure your first application is as strong as possible to avoid paying the council charge twice.

How to budget for the whole process

Labour is a large share of any job, and London and the South East cost more. Your budget must cover the main build, making the building weathertight, first fix plumbing and electrics, and second fix finishing. First fix involves the hidden wires and pipes, while second fix covers the visible fittings like sockets and taps.

You must also plan for things that are usually left out of a basic build quote. A quote will only cover the building work specified in your plans.

  • Kitchens and bathrooms
  • Flooring and decoration
  • Professional fees for architects and engineers
  • Planning and building control fees
  • Party wall costs
  • VAT at 20 per cent

You should agree stage payments and a final payment on completion. Tie these payments to progress on site. Leave the final instalment until snagging and certificates are done. Snagging is the process of fixing minor faults at the end of the job, such as touching up paint or adjusting doors.

Include a contingency fund for unexpected problems. Your contract should cover provisional sums, which are allowances for things that cannot be priced yet. It should also cover variations, which are changes after the price is agreed. Changing the design mid-build without agreeing the cost in writing is a fast way to lose control of your budget.

Rules, schemes and consumer protection

Under the Consumer Rights Act 2015, tradespeople must carry out work with reasonable care and skill, for a reasonable price and within a reasonable time where none was agreed. A quote is fixed and an estimate is not. You have a 14-day cooling-off period for contracts agreed at home, by phone or online. You also have Section 75 protection on credit card payments. Citizens Advice is the signpost for disputes.

Under the CDM Regulations 2015 a domestic client's health and safety duties normally pass to the builder. Houses built or refurbished before 2000 may contain asbestos, which must be dealt with by competent people. Do not attempt electrical, gas, structural or other dangerous work yourself. Send for a qualified tradesperson.

Gas work needs a Gas Safe registered engineer and electrical work a registered electrician. Certain trades can self-certify through a competent person scheme. Always confirm membership on the scheme's own register and treat it as a good sign, not a guarantee. The Federation of Master Builders vets and independently inspects members. TrustMark is the government-endorsed quality scheme.

Common mistakes and scams in this trade

Cowboy builders who take on more jobs than they can staff can drag a project out. You must protect yourself by demanding proper paperwork and setting clear terms before any work begins.

  • Choosing a builder on price alone
  • Starting without drawings, a specification or a written contract
  • Paying large cash deposits before work begins
  • Accepting an estimate as if it were a fixed quote
  • Changing the design mid-build without agreeing the cost in writing
  • Being told building regulations are not needed
  • Accepting cash deals offered without VAT or paperwork
  • Not telling the home insurer about the planned work
  • Paying the final instalment before snagging and certificates are done

A good builder will want a written contract just as much as you do. They will be happy to show you their insurance and let you speak to previous customers. If a builder pressures you for cash upfront or tells you to skip building control, find someone else.

Common questions

How long does a planning application take?

Most planning applications are decided within eight weeks in England. This extends to 13 weeks for unusually large or complex applications.

Do I need planning permission for a small extension?

Many extensions fall under permitted development, within set limits on size, height and position. You can read more about whether you need planning permission for an extension or loft to check the exact rules. You should always confirm the requirements with your council before building.

A lawful development certificate gives written proof that a project is permitted development. The completion certificate from building control also matters when selling. Councils can now take enforcement action for up to ten years if building regulations were not followed.

Does the fee cover building regulations?

No, planning permission and building regulations are two separate systems. You will pay a separate fee to council building control or a registered building control approver for checking your structural and safety plans.

Next steps for your project

Before you hire anyone, make sure you have your paperwork ready. Visit finished jobs, ask for proof of insurance, and ensure your finances are in place. Scotland and Northern Ireland have their own systems, so check locally if you live there.

  • Decide your design and get professional drawings made
  • Submit your application and pay the council fee and service charge
  • Hire a structural engineer if your design needs calculations
  • Apply for building regulations approval
  • Get three written quotes against the same drawings and specification
  • Sign a written contract with staged payments and a contingency

Taking the time to understand the fees and prepare a detailed specification will protect your budget. Once your drawings are finished and your permissions are granted, you are ready to find a builder near you to price the job properly.

Find a top rated builder near you

3,554 builders across the UK, each ranked on their Google rating and the number of reviews behind it. Start with your county:

All counties and towns · The UK Top 100 builders

Rachel Dawson
Written by
Rachel Dawson Writer

Rachel writes for Top Rated Builders, with a focus on helping homeowners compare quotes and ask the right questions. Away from the desk, she runs a book club with friends.

Looking for a trusted builder? Browse our verified listings.

Find a Builder